Search directory

Filter by

995 results found

River Water Quality Monitoring 1990 to 2018 - Dissolved Copper

This table provides the raw data from river monitoring sites including Water Framework Directive monitoring sites. It should be noted that, as the data set is in its raw state, it cannot be used to...

River Water Quality Monitoring 1990 to 2018 - Dissolved Copper

This table provides the raw data from river monitoring sites including Water Framework Directive monitoring sites. It should be noted that, as the data set is in its raw state, it cannot be used to...

River Water Quality Monitoring 1990 to 2018 - Dissolved Copper

This table provides the raw data from river monitoring sites including Water Framework Directive monitoring sites. It should be noted that, as the data set is in its raw state, it cannot be used to...

River Water Quality Monitoring 1990 to 2018 - Dissolved Copper

This table provides the raw data from river monitoring sites including Water Framework Directive monitoring sites. It should be noted that, as the data set is in its raw state, it cannot be used to...

RiverWaterQualityMonitoring 1990to2024 DissolvedOxygen

This dataset comprises water quality data from the NIEA water quality database from 1st January 1990 to 31st December 2024. Note that the dataset may contain results which are erroneous due to...

River Water Quality Monitoring 1990 to 2024 - All Parameters

This dataset comprises water quality data from the NIEA water quality database from 1st January 1990 to 31st December 2024. Note that the dataset may contain results which are erroneous due to...

Specific Pollutants 1990 to 2024

***Cypermethrin is currently designated as a Priority Substance under the EU Environmental Quality Standards Directive (2013/39/EU), which is a daughter directive of the Water Framework Directive...

Priority Substances 1990 to 2024

***Cypermethrin is currently designated as a Priority Substance under the EU Environmental Quality Standards Directive (2013/39/EU), which is a daughter directive of the Water Framework Directive...

River Water Quality Monitoring 1990 to 2024 - All Parameters

This dataset comprises water quality data from the NIEA water quality database from 1st January 1990 to 31st December 2024. Note that the dataset may contain results which are erroneous due to...

Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering and Design (FEED) - Chapters 01 - 03: Executive Summary

During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...

Soil respiration responses to carbon, nitrogen and phosphorous additions to topsoil and subsoil cores from the Conwy catchment in North Wales (2014)

The data consists of raw data on measured carbon dioxide (CO2) and nitrous oxide concentration (N2O) concentrations from intact soil topsoil (0-15 cm) and subsoil cores (85-100 cm) to added carbon,...

Green Infrastructure Areas for the Black Country (GIBC)

Overview The Green Infrastructure Areas for the Black Country (GIBC) data identifies green infrastructure, green infrastructure function (or ecosystem service) and pinch point mapping for the Black...

BGS 1:63 360 / 1:50 000 series geological maps

The 1:63 360 / 1:50 000 scale map series are the most useful scale for most purposes. They provide almost complete coverage of onshore Great Britain. The BGS collection of 1:63 360 and 1:50 000...

Caledonian Pinewood Inventory

Description: Scots pine (Pinus sylvestris L.) has the largest natural distribution of any conifer in the world, ranging from northern Norway to Spain, and from Scotland across Europe and Asia to...

Planning Applications Decisions - Major and Minor Developments , England, District by Development Type

Planning applications decided by district level planning authority and type of development District level planning is undertaken by metropolitan and non-metropolitan districts, unitary...

Planning Applications Decisions - Other Developments, England, District by Outcome

Planning applications decided by district level planning authority and outcome District level planning is undertaken by metropolitan and non-metropolitan districts, unitary authorities, national...

Planning Applications Decisions - All Developments, England, District by Speed of Decision

Planning applications decided by district level planning authority and speed of decision District level planning is undertaken by metropolitan and non-metropolitan districts, unitary authorities,...

Planning Applications Decisions - Other Developments, England, District by Development Type

Planning applications decided by district level planning authority and type of development District level planning is undertaken by metropolitan and non-metropolitan districts, unitary...

Planning Applications Decisions - Major and Minor Developments, England, District by Outcome

Planning applications decided by district level planning authority and outcome. District level planning is undertaken by metropolitan and non-metropolitan districts, unitary authorities, national...

Optimise Prime

Optimise Prime has gathered data from over 6,000 Electric Vehicles (EVs) driven for commercial purposes through three trials. The project also implemented a range of technical and commercial...