Search directory

Filter by

113 results found

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 08: Consents and Permitting Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

Implementing the Government ICT Strategy - ICT Metrics

In March 2011, the Coalition Government set out a vision for Government ICT at the heart of delivery of efficient, cost-effective public services which are responsive to the needs of citizens and...

Tree Preservation Orders - Aberdeenshire

*Whilst TPOs are a legal requirement they may not always be digitised accurately. Users of this data should not assume this data is totally accurate and should consult the specific local authority...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 02: FEED Cost Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 06: Health, Safety and Environment Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 09: Stakeholder Profiling Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering and Design (FEED) - Chapter 04: Project Design

During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...

Mid-year population estimates

Description of Data Population estimates for the 3,780 Data Zones in Northern Ireland were published on 29th May 2025. Time Period Estimates are provided for mid-2021 to mid-2023. Notes: 1....

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 01: Programme Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering and Design (FEED) - Chapter 07: Technical Design - Well and Storage

During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...

Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering and Design (FEED) - Chapter 10: Project Management Reports

During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...

Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering and Design (FEED) - Chapter 09: Environment and Consent

During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 11: Lessons Learned Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering and Design (FEED) - Chapter 05: Technical Design-Carbon capture and compression plant

During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...

UK Biodiversity Indicator C9b, Plant genetic resources - Enrichment Index

This spreadsheet is the underlying data for the biodiversity indicator C9b, Plant genetic resources - Enrichment Index. The UK is relatively rich in wild relatives of crops, landraces of cereal,...

Purchase Order Transactions

A Purchase Order is a document sent by the Council to a supplier indicating types, quantities, and agreed prices for products or services. Acceptance of a purchase order forms a contract between...

Mid-year population estimates

Description of Data Population estimates for the 850 Super Data Zones in Northern Ireland were published on 29th May 2025. Time Period Estimates are provided for mid-2021 to mid-2023. Notes: 1....

NFI+ Soil Condition & Health

This dataset contains comprehensive soil chemical, physical and biological indicators collected as part of the NFI+ (National Forest Inventory Plus) programme and the BioSoil forest soil and...

Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering and Design (FEED) - Chapters 01 - 03: Executive Summary

During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...

Habitat point records from 1984 NCC/OPRU Loch Sween sublittoral survey

Loch Sween is situated on the east side of the Sound of Jura, in south-west Scotland. It opens to the south-west and its mouth is partially protected by the small MacCormaig Isles. The main body of...