Search directory

Filter by

2,439 results found

Origin of video transects, i.e. location of start of video footage, with habitat characterisation from Bassurelle Sandbank SCI

Origin of video transects, i.e. location of start of video footage, with habitat characterisation from Bassurelle Sandbank SCI (CEND 03/13). ArcGIS point feature class. Video footage was collected...

UKCCSRC Call 2 Project: The Development and Demonstration of Best Practice Guidelines for the Safe Start-up Injection of CO2 into Depleted Gas Fields

The aim of this proposal is to develop and validate a multi-phase flow model for simulating the highly transient flow phenomena taking place in the well-bore during start-up injection of CO2...

Origin of video transects, i.e. location of start of video footage, with habitat characterisation from Wight-Barfleur Reef SCI

Origin of video transects, i.e. location of start of video footage, with habitat characterisation from Wight-Barfleur Reef SCI (CEND 03/13). ArcGIS point feature class. Origin of video transects,...

Investment in start up and scale up in tech sector

Maintained nursery and primary school provision for three to four year olds

Number of part time funded nursery and primary school places filled by three and four year olds Source: Department for Education and Skills (DfES), Learning and Skills Council (LSC). Publisher:...

UKCCSRC Call 2 project poster: The Development and Demonstration of Best Practice Guidelines for Safe Start-up Injection of CO2, Cranfield Biannual 21.04.15

This poster on the UKCCSRC Call 2 project, The Development and Demonstration of Best Practice Guidelines for the Safe Start-up Injection of CO2 into Depleted Gas Fields, was presented at the...

UKCCSRC Call 2 project poster: The Development and Demonstration of Best Practice Guidelines for the Safe Start-up Injection of CO2, Cardiff Biannual, 10.09.14

This poster on the UKCCSRC Call 2 project, The Development and Demonstration of Best Practice Guidelines for the Safe Start-up Injection of CO2 into Depleted Gas Fields, was presented at the...

Composition of starting materials, conditions under which those materials were heated to metamorphic temperatures and analytical results, including mineralogy and phosphorus speciation

The dataset includes results from laboratory experiments aiming to explore the reduction and polymerization potential of phosphorus under metamorphic conditions. Table 1 shows the initial...

Maintenance Point

A feature which has a point geometry and provides information about whether the road is maintained at public expense by a national or local highway authority, a road authority or is maintained by...

Maintenance Line

A feature which has a line / curve geometry and provides information about whether the road is maintained at public expense by a national or local highway authority, a road authority or is...

Maintenance Area

A feature which has a closed (area) geometry and provides information about whether the road is maintained at public expense by a national or local highway authority, a road authority or is...

UKCCSRC Call 2 project presentation: The development and demonstration of best practice guidelines for the start-up injection of CO2 into highly-depleted gas fields, UKCCSRC Edinburgh Biannual Meeting, 15.09.2016

This presentation on the UKCCSRC Call 2 project The development and demonstration of best practice guidelines for the start-up injection of CO2 into highly-depleted gas fields was presented at the...

UKCCSRC Call 2 project poster: The Development and Demonstration of Best Practice Guidelines for the Safe Start-up Injection of CO2, CSLF Call project poster reception, London, 27.06.16

This poster on the UKCCSRC Call 2 project The Development and Demonstration of Best Practice Guidelines for the Safe Start-up Injection of CO2 into Depleted Gas Fields was presented at the CSLF...

NI 179 - Value for money - total net value of ongoing cash-releasing value for money gains that have impacted since the start of the 2008-09 financial year

All parts of the public sector need to continue to seek and implement ways to deliver higher quality public services with the resources that are available. This means enhancing value for money and...

Temporal data on the construction and operation start dates of UK offshore wind farms 2003 to 2018

The temporal patterns of offshore wind farm (OWF) activity during the installation of the turbine foundations were examined using data from 2003 to 2018, a timeframe over which the UK’s OWFs have...

Register of Geographic Codes (June 2026) for the UK

The Register of Geographic Codes (RGC) is a key product that contains the definitive list of UK statistical geographies. ONS maintains the definitive set of statistical geographies, coordinates the...

Potential Data Standards May 2016

This dataset is now retired and it is no longer maintained. This is the Environment Agency list of potential data standards. These data standards were identified through an assessment of the IT and...

Register of Geographic Codes (June 2025) for the UK

The Register of Geographic Codes (RGC) is a key product that contains the definitive list of UK statistical geographies. ONS maintains the definitive set of statistical geographies, coordinates the...

Register of Geographic Codes (December 2025) for the UK

The Register of Geographic Codes (RGC) is a key product that contains the definitive list of UK statistical geographies. ONS maintains the definitive set of statistical geographies, coordinates the...

Procurement Contracts

Existing Contracts Register for awarded contracts over £5,000. An extract of all published contract awards starting from 01 April 2017. The data names the buyer and the awarded suppliers, plus...