Search directory

Filter by

2,600 results found

B-Lines East

Polygon of Eastern network for Buglife's national B-Lines initiativeto focus the creation/restoration of wildflower habitats and help reverse pollinator declines. The East network includes 3km...

Pan-European map showing relative suitability score for Pile foundations translated from EMODnet Bathymetry water depth (offshore wind)

Pan-European water depth suitability map, derived from EMODnet (European Marine Observation and Data Network) Bathymetry data, showing the relative suitability for offshore wind pile foundations....

Seismo-Volcanic Crisis in Afar: The 2005 Boina-Erta 'Ale Rupture-Eruption Sequence

PROJECT DETAILS ONLY - NO DATA. Since 20 September, 2005, an ~120 km-long segment of the Red Sea rift system in Ethiopia has been rocked by 31 earthquakes detected on seismometers worldwide. Ashes...

NICS Email Traffic

Monthly summary of emails sent and received by NICS network

Bradford council printers

A list of all networked printers for the Bradford council

Closed Circuit Television (CCTV)

Closed Circuit Television - Images of numerous locations on the network

Watercourse Reaches

Link to Ordnance Survey OS Open Data for Water networks.

Nitrogen Dioxide Diffusion Tube Sites

Salford operates a nitrogen dioxide diffusion tube network to obtain information on the temporal and spatial variation. The network has over 10 years of data at various locations in the area. The...

LiDAR for Scotland Phase 5 - DTM

The Scottish Public Sector LiDAR (Phase 5) was initially captured by Fugro for Scottish Power Energy Network (SPEN) from 2020 to 2021 to monitor their overhead power cable network under their...

LiDAR for Scotland Phase 6- DTM

The Scottish Public Sector LiDAR (Phase 6) was initially captured by Fugro for Scottish Power Energy Network (SPEN) from 2022 to 2022 to monitor their overhead power cable network under their...

LiDAR for Scotland Phase 5 - LAS

The Scottish Public Sector LiDAR (Phase 5) was initially captured by Fugro for Scottish Power Energy Network (SPEN) from 2020 to 2021 to monitor their overhead power cable network under their...

LiDAR for Scotland Phase 6 - LAS

The Scottish Public Sector LiDAR (Phase 6) was initially captured by Fugro for Scottish Power Energy Network (SPEN) from 2021 to 2022 to monitor their overhead power cable network under their...

Land & Property Assets - Rochdale Borough Council

Dataset of land and property assets, where the Council has either has an ownership or occupational interest. Council housing stock properties are not part of the land and property...

Local Development Plan: Areas for Action - Argyll and Bute

Areas for Action designated in the Argyll and Bute adopted Local Development Plan 2015. Subject to resource availability during the plan-period, these areas will be the focus for partnership or...

Green Chains in The Royal Borough of Kingston upon Thames

Green Chains are defined as a series of elongated Metropolitan Open Land surrounding the Borough's major watercourses linking the Green Belt and broader areas of open land within the urban area....

Potentially Vulnerable Areas (PVAs)

Potentially Vulnerable Areas (PVAs) are geographical areas that are designated for flood management under the Flood Risk Management Act (Scotland) 2009. They show parts of catchments and coastal...

London Plan Opportunity Areas

Opportunity Areas are London’s major source of brownfield land with significant capacity for new housing, commercial and other development linked to existing or potential improvements to public...

Aqueducts

Point locations of aqueducts that interact with the Canal & River Trust network.

Docks

Polygon locations of docks that interact with the Canal & River Trust network.

Wharves

Point locations of wharves that interact with the Canal & River Trust network.