Search directory

Filter by

6,051 results found

NCEO atmospheric profiles retrieved from the Michelson Interferometer for Passive Atmospheric Sounding (MIPAS) instrument onboard ESA's Envisat satellite

This dataset contains atmospheric profiles from the Michelson Interferometer for Passive Atmospheric Sounding (MIPAS) on Envisat, processed with the Oxford L2 retrieval algorithm MORSE. This...

Salford City Council - Premises licences

Premises licences issued by Salford City Council. These are licences issued to premises which sell alcohol, provide regulated entertainment or serve hot food after 11pm. Dataset is formatted to...

NCEO atmospheric profiles retrieved from the Michelson Interferometer for Passive Atmospheric Sounding (MIPAS) instrument onboard ESA's Envisat satellite

This dataset contains atmospheric profiles from the Michelson Interferometer for Passive Atmospheric Sounding (MIPAS) on Envisat, processed with the Oxford L2 retrieval algorithm MORSE. This...

U-Pb geochronology data for Mindola Deposit, Zambia Copperbelt

U-Pb (Uranium – Lead) geochronology data of rutile from the Mindola Deposit Zambia Copperbelt. Full U/Pb isotope data, uncertainties and calculated ages for individual spot analyses for each sample...

Isotope compositions of a gas storage site Poland

The Borzęcin natural gas reservoir has been producing gas since the 1970s. The natural gas reservoir is located in the Zielona Góra basin, in the Polish part of the European Permian Basin. The...

Department for Environment, Food and Rural Affairs (DEFRA) MCZ: Fulmar: Multibeam, Benthic Sampling and Video survey flmr_cend0812: Northern North Sea (06/05/2012 to 10/05/2012)

Multibeam data acquired on transit between GT stations collecting bathymetry and backscatter to client specifications, WGS84 latitude and longitude co-ordinates collected by Differential Global...

Soil properties and soil greenhouse gas emissions in biochar-amended bioenergy soils undergoing long term field incubation

Data collected during field and laboratory experiments to investigate the long-term effects of biochar application to soil on greenhouse gas emissions in a bioenergy plantation (Miscanthus X....

Household interim projections, 2011-2021 (1000s), England, District By Household Type

The figures are based on the 2011-based interim sub-national population projections, published by the Office for National Statistics in September 2012. They replace the 2008-based household...

Household interim projections, 1991-2021 (1000s), England, District, Population

The figures are based on the 2011-based interim sub-national population projections, published by the Office for National Statistics in September 2012. They replace the 2008-based household...

Household interim projections, 2011-2021 (1000s), England, District By Age

The figures are based on the 2011-based interim sub-national population projections, published by the Office for National Statistics in September 2012. They replace the 2008-based household...

Household interim projections, 2011-2021 (1000s), England, District By Dependent Children

The figures are based on the 2011-based interim sub-national population projections, published by the Office for National Statistics in September 2012. They replace the 2008-based household...

Household interim projections, 1991-2021 (1000s), England, District, Total

The figures are based on the 2011-based interim sub-national population projections, published by the Office for National Statistics in September 2012. They replace the 2008-based household...

basildon_cs2012_padc6

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc10

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc1

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc12

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc11

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc13

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc2

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc3

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...