Filter by
1,754
results found
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 02 April 2026
An oil and gas industry drilling hazard, debris clearance, anchoring conditions, semi-sub rig site survey acquired under licence P101 in September 2021. The block numbers traversed were 13/23,...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 02 April 2026
An oil and gas industry debris clearance, drilling hazard, environmental site survey acquired under licences P103, P1986, P2450, P496, P2344, P2335 in April 2022. The block number traversed was 9/19.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 02 April 2026
An oil and gas industry 3D survey acquired under licences P118, P2350, P241, P347, P741 in July 2021. The block numbers traversed were 21/1, 21/2, 21/3, 21/4.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 02 April 2026
An oil and gas industry environmental, drilling hazard, semi-sub rig site survey acquired under licence P2050 between June and July 2013. The block numbers traversed were 30/29, 38/4, 38/5, 39/1b.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 02 April 2026
An oil and gas industry debris clearance, environmental, semi-sub rig, geotechnical site survey acquired under licences P1077, P1759 between May and June 2013. The block numbers traversed were...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 02 April 2026
Whilst sub-seabed Carbon Capture and Storage (CCS) has the potential to remove a significant proportion of anthropogenic CO2 emissions at source, research is necessary to constrain the...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 02 April 2026
A Multiphysics model for a molten carbonate fuel cell (MCFC) developed in COMSOL. This is a multiphysics model for a MCFC. It has been built using COMSOL Multiphysics®. It enables the user to...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 02 April 2026
An oil and gas industry debris clearance, jack up rig, environmental, seabed infrastructure site survey acquired under licences P291, P292 between May and June 2017. The block numbers traversed...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 02 April 2026
An oil and gas industry semi-sub rig, route site survey acquired under licences P2358, P1987, P101, P297 between March and April 2019. The block numbers traversed were 13/23, 13/24, 13/28.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 02 April 2026
An oil and gas industry debris clearance, seabed infrastructure site survey acquired under licence P928 between October and November 2017. The block numbers traversed were 20/1N, 17/26a, 14/26c,...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 02 April 2026
An oil and gas industry debris clearance, shallow geotechnical, pipeline route site survey acquired under licences E422, P165 between June and July 2018. The block numbers traversed were...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 02 April 2026
An oil and gas industry drilling hazard, semi-sub rig site survey acquired under licences P2006 and E447 between May and November 2016. The block numbers traversed were 21/6, 21/7, 21/2, 21/1.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 02 April 2026
An oil and gas industry exploration drilling, environmental, debris clearance, semi-sub rig, drilling hazard site survey acquired under licence P2067 in June 2016. The block numbers traversed were...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 02 April 2026
An oil and gas industry geotechnical site survey acquired between January and March 1998. The block numbers traversed were 21/24, 21/25, 21/29, 21/30, 22/21, 22/26, 28/4, 28/5, and 29/1.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 02 April 2026
An oil and gas industry rig site survey acquired in July 2008. The block number traversed was 29/3 covering the proposed 29/3a-B Fram Well location, prior to emplacement of a semi-submersible...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 02 April 2026
An oil and gas industry site survey for a semi-sub rig acquired under licences P101, P729, P297 in May 2012. The block numbers traversed were 13/24a, 13/29b, 13/28a.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 02 April 2026
An oil and gas industry pipeline route site survey acquired under licences P1107, P1617 between July and August 2012. The block numbers traversed were 21/12a, 21/12b, 21/12c, 21/12d.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 02 April 2026
An oil and gas industry site survey acquired in May 2004 to provide an assessment of seabed and sub-seabed conditions prior to the location of a semi-submersible drilling rig. The block number...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 02 April 2026
An oil and gas industry environmental, drilling hazard, semi-sub rig site survey acquired under licences P218, P1870, P185 in March 2012. The block numbers traversed were 15/21a, 15/21d, 15/22.
- Published by:
- London Borough of Camden
- Last updated:
- 01 August 2016
This database includes total energy consumption (i.e. gas, electricity, heat) in kWh and total carbon footprint in kgCO2e (calculated using Defra’s 2014 carbon emission factors) for each site that...