Search results

Filter by

Remove filters

2,680 results found

Further Education Learning Aims database

Data used by SLC to offer as reference data in the application process for Advanced Learning Loans.

UKGEOS Cheshire - TH0424 Final Borehole Information Pack

The final borehole information pack from the TH0424 Ground Investigation Borehole drilled as part of the UK Geoenergy Observatories (UKGEOS) Cheshire facility. TH0424 was drilled to TD of 101 m...

Comparison of original and final budgets 2009-10

Comparison of outturn information with final plans by department for 2009-10, taken from snapshots 31 and 11 (Main Estimate outturn snapshot April 2010 and Spring Supplementary Estimates plans...

Qualifications and Unit Funding Trials (inc Qualification and Credit Framework/Learning Aim Reference Application)

Qualifications and Unit Funding Trials (inc Qualification and Credit Framework/Learning Aim Reference Application), who has taken part and whether it was successful.

Open Data Innovation and Outreach Fund Final Report

OurRagingPlanet (ORP) was desiged as a natural disaster education tool. It aims to help secondary school students contextualize experiences of communities around the world when thrust into extreme...

AIMS Spatial Flood Defences (inc. standardised attributes)

This record is for Approval for Access product AfA345. The Environment Agency's (EA) Spatial Flood defences layer is the only comprehensive and up-to-date dataset in England that shows flood...

Final Report On NPS Use In Children And Young People March 2015

Final report on the use of novel psychoactive substances among children and young people in Camden and Islington, describing the local prevalence of the use of these substances, and identifying...

Final claims data

Colleges, commercial and charitable providers and other institutions provide an annual funding return to the EFA which is recorded and held currently in Excel spreadsheets. This data consists of...

West Hendon Playing Fields – Addendum Report, Consultation Report and Draft Final Master Plan

The meeting of the Environment Committee on 12 March 2020 will consider a report on Sports Hubs master planning. The development of three Sports Hubs in Barnet was one of the recommendations of the...

Tunbridge Wells Open Data - Transparency - Final Medium Term Financial Strategy 2017-18 to 2021-22

Tunbridge Wells Open Data - Transparency - Final Medium Term  Financial Strategy 2017-18 to 2021-22

Nitrate Vulnerable Zones (NVZ) 2017 - Combined (Final Designations)

PLEASE NOTE: This dataset has been retired, as it has been superseded by the dataset for Nitrate Vulnerable Zones (NVZ) 2021 Designations. See:...

EU Project Report: Saline Aquifer CO2 Storage (SACS2). Final report, geological characterisation of the Utsira Sand reservoir and caprocks (Work Area 1)

This report forms part of the international SACS (Saline Aquifer CO2 Storage) project. The project aims to monitor and predict the behaviour of injected CO2 in the Utsira Sand reservoir at the...

Fault Seal controls on aquifer CO2 storage capacity UKCCSRC; third and final annual report project update

The data consists of a short project update for the 2015/16 annual report and the final report for the project. The update describes work carried-out on behalf of the 'Fault seal controls on CO2...

% of final Education, Health & Care Plans issued within statutory time limits, including exceptions (definition changed Sept 2014)

% of final Education, Health & Care Plans issued within statutory time limits, including exceptions (definition changed Sept 2014)

UKCCSRC Call 1 project blog: Oxyfuel and EGR Processes in GT Combustion, Final, 01.08.14

This is a blog (Final, 01.08.14) on the UKCCSRC Call 1 project, Oxyfuel and EGR Processes in GT Combustion. Grant number: UKCCSRC-C1-26.

UKCCSRC Call 1 project blog: Multi-Phase Flow Modelling for Hazardous Assessment, Final, 18.11.14

This is a blog (Final, 18.11.14) on the UKCCSRC (UK Carbon Capture and Storage Research Centre) Call 1 project, Multi-Phase Flow Modelling for Hazardous Assessment. Grant number: UKCCSRC-C1-07.

University of Aberdeen – NSTA Frontier Basins Rockall Project: A new view of the UK Rockall Prospectivity (Final)

This delivery provides the final products from a two year post-doctoral research project that was undertaken at the University of Aberdeen. This project is focused on the Rockall Trough area of...

EU Project Report: NASCENT - Natural Analogues for the Geological Storage of CO2, Final Report

This is the final report of the Natural Analogues for the Geological Storage of CO2 in the Geological Environment (NASCENT) project. The NASCENT project has studied natural accumulations of carbon...

EPSRC project final report: Fingerprinting captured CO2 using natural tracers: Determining CO2 fate and proving ownership

Final report for EPSRC project, Fingerprinting captured CO2 using natural tracers: Determining CO2 fate and proving ownership. Grant number: #EP/K036033/1.

UKCCSRC Call 2 Project Final Report: Novel Reductive Rejuvenation approaches for degraded amine solvents from PCC in power plants

Final Report for UKCCSRC Call 2 Project C2-189. Novel Reductive Rejuvenation approaches for degraded amine solvents from PCC in power plants.