Search directory

Filter by

797 results found

Wood Production (roundwood removals): 1976 to 2018 FINAL

Wood production (roundwood removals) for 1976 to 2018 FINAL. The data are broken down by: -England, Wales, Scotland, Northern Ireland, GB and UK; -Softwood and hardwood; -Forestry...

UKGEOS Glasgow GGC01 Final Borehole Information Pack

The borehole information pack from borehole GGC01, site 10 of the UK Geoenergy Observatories (UKGEOS) Glasgow facility. This final data release pack from BGS contains geophysical (MSCL-S), Near...

Early Years Foundation Stage Profile Attainment by Pupil Characteristics in Schools in England

This Statistical First Release (SFR) provides information on attainment for the new Early Years Foundation Stage Profile (EYFSP) by pupil characteristics, specifically gender, ethnicity,...

UKGEOS Cheshire - TH0424 Final Borehole Information Pack

The final borehole information pack from the TH0424 Ground Investigation Borehole drilled as part of the UK Geoenergy Observatories (UKGEOS) Cheshire facility. TH0424 was drilled to TD of 101 m...

EYFS Attainment

A data set which shows the number of pupils achieving a good level of development at the Early Years Foundation Stage by MSOA. Where the MSOA has fewer than five pupils, all data have been suppressed.

Achievement and Attainment Tables for GCE/VCE/Applied A/AS and Equivalent Results in England

Now re-named Performance Tables, these statistics contain school and college level information on the performance of pupils reaching the end of their Key Stage 5 education in England. Source...

%pt gap between FSM and non-FSM pupils at 15, who attain a Level 3 qualification by the age of 19 - (Snapshot)

%pt gap between FSM and non-FSM pupils at 15, who attain a Level 3 qualification by the age of 19 - (Snapshot) This measure contributes to our understanding of the inequality gap. It looks at the...

Comparison of original and final budgets 2009-10

Comparison of outturn information with final plans by department for 2009-10, taken from snapshots 31 and 11 (Main Estimate outturn snapshot April 2010 and Spring Supplementary Estimates plans...

%pt gap between FSM and non-FSM pupils at 15, who attain a Level 2 qualification by the age of 19 - (Snapshot)

%pt gap between FSM and non-FSM pupils at 15, who attain a Level 2 qualification by the age of 19 - (Snapshot)

Final report from North Norfolk Sandbanks and Saturn Reef SAC

Final report from North Norfolk Sandbanks and Saturn Reef SAC (CEND 22/13). This report describes the findings from the analysis of data collected during the 2013 survey to North Norfolk Sanbanks...

Final Report On NPS Use In Children And Young People March 2015

Final report on the use of novel psychoactive substances among children and young people in Camden and Islington, describing the local prevalence of the use of these substances, and identifying...

EU Project Report: RISC - Research into Impacts and Safety in CO2 Storage, Final Report

The RISCS (Research into Impacts and Safety in CO2 Storage) project assessed the potential environmental impacts of leakage from geological CO2 storage. Consideration was given to possible impacts...

West Hendon Playing Fields – Addendum Report, Consultation Report and Draft Final Master Plan

The meeting of the Environment Committee on 12 March 2020 will consider a report on Sports Hubs master planning. The development of three Sports Hubs in Barnet was one of the recommendations of the...

Final claims data

Colleges, commercial and charitable providers and other institutions provide an annual funding return to the EFA which is recorded and held currently in Excel spreadsheets. This data consists of...

EU Project Report: SiteChar - Characterisation of European CO2 storage, Final Report

The objective of the EU SiteChar Project was to facilitate the implementation of CO2 geological storage in Europe by developing a methodology for the assessment of potential storage sites and the...

Tunbridge Wells Open Data - Transparency - Final Medium Term Financial Strategy 2017-18 to 2021-22

Tunbridge Wells Open Data - Transparency - Final Medium Term  Financial Strategy 2017-18 to 2021-22

Key Stage 2 Attainment

A data set which shows the number of pupils achieving the expected standard at Key Stage 2 by MSOA. Where the MSOA has fewer than five pupils, all data have been suppressed.

Key Stage 4 Attainment

A data set which shows the number of pupils achieving a strong pass (grades 9-5) at Key Stage 4 by MSOA. Where the MSOA has fewer than five pupils, all data have been suppressed.

Pupil attainment at Key Stage 1 and 2, GCSE and equivalent, Post-16 and value added measures by ACORN category

Key Stage 1 and 2 National Curriculum assessments, GCSE and equivalent achievements and post-16 attainment of young people in England by ACORN category Source: Department for Education and Skills...

Nitrate Vulnerable Zones (NVZ) 2017 - Combined (Final Designations)

PLEASE NOTE: This dataset has been retired, as it has been superseded by the dataset for Nitrate Vulnerable Zones (NVZ) 2021 Designations. See:...