Search directory

Filter by

951 results found

Wimbledon Golf Park Course Final Decision Notice & S106

Expenditure on local authority owned dwellings that received Capital type installation, replacement or major repairs (£000s)

The purpose of the Business Plan Statistical Appendix (BPSA) is to bring together information about a non-Large Scale Voluntary Transfer (LSVT) authority's Housing Revenue Account (HRA) stock. The...

Lichfield District Council - Local Land Charges Estimates and Final Statements

Local land Charges Estimates statements are published in line with Regulation 9 of the Local Authorities (England)(Charges for Property Searches) Regulations 2008 Statutory Instrument 2008 No...

EU Project Report: Saline Aquifer CO2 Storage (SACS2). Final report, geological characterisation of the Utsira Sand reservoir and caprocks (Work Area 1)

This report forms part of the international SACS (Saline Aquifer CO2 Storage) project. The project aims to monitor and predict the behaviour of injected CO2 in the Utsira Sand reservoir at the...

2017-2018 Jon Ford Environmental Consultancy Kentish Flats Extension Offshore Wind Farm Post Construction Bird Surveys

This report presents the results of the bird monitoring programme that has been undertaken between October 2017 and March 2018, and summarises the overall results from that programme....

CS RIB No 02 ' ONS 2011 Census First Release' FINAL ( Jul 12)

Briefing paper on the initial results for Camden from the 2011 Census (PDF).

Joule II Project Report: The underground disposal of carbon dioxide : Final Report

The purpose of Joule II Project Number CT92-0031 'The Underground Disposal of Carbon Dioxide' was to examine the potential for reducing CO2 emissions to the Earth's atmosphere from fossil fuel...

Appendix D - Secondary School Places Planning Report - July Scrutiny 2014 FINAL SIGN OFF

Secondary school places planning report 2014 (tables)

Appendix 2 Secondary School Places Planning Report - 2014 July Scrutiny FINAL SIGN OFF

Secondary school place planning report 2014

Appendix E Primary School Places Planning Report - July Scrutiny 2014 FINAL SIGN OFF

Primary school places planning report 2014 (tables)

Appendix 1 Primary School Places Planning Report - 2014 July Scrutiny FINAL SIGN OFF

Primary places planning report 2014.

Establishment of Memory Services - Results of a survey of PCTs, final figures 2011

This report provides full results of a voluntary survey of PCTs and Care Trusts which commission memory assessment services for dementia and follows a provisional report published on 19 July 2011....

http://www.northlincolnshireccg.nhs.uk/data/uploads/p10-nlccg-final-1819.csv

JAN 2019 - OVER 25k SPEND

Joule II Project Report: The underground disposal of carbon dioxide : Final Summary Report

This report give detailed results, conclusions and recommendations of the Joule II project CT92-0031. 'The Underground Disposal of Carbon Dioxide'. A summary of the results of the project is given...

Camden and Islington Sport and Physical Activity Needs Assessment for CYP 2013 - Final Report

This needs assessment provides an analysis of needs relating to the provision of sport and physical activity for young people aged 0-18 (0-25 disabled) in Camden and Islington, with a view to...

Geophysical methodologies for the characterisation of gas hydrate core (HYDRAGAS) - Final Report to NERC Oct04

Through manufacturing, and geophysically characterising the properties and distribution of a range of synthetic gas hydrate morphologies in a range of sediments in the laboratory, protocols will be...

UKGEOS Glasgow GGA02 borehole information pack

The borehole information pack from borehole GGA02, site 01 of the UK Geoenergy Observatories (UKGEOS) Glasgow facility. This release from the British Geological Survey (BGS) contains BGS and...

Renewable Heat Incentive (RHI) and Renewable Heat Premium Payments (RHPP) monthly deployment data

The monthly statistics for the Renewable Heat Incentive (RHI) programme present the number of applications and accredited installations on the scheme so far. The figures are broken down by...

EU project data: SACS / SACS2 data - Final Regional Digital Grids of the Utsira Sand (1999 - 2002)

Regional property grids of the Utsira Sand based on mapping from 2D regional seismic lines and geophysical logs. Grids include: Top Utsira depth, Base Utsira depth, Utsira isopach, Utsira porosity,...

Dating of Authigenic K-feldspar as a tracer of fluid flow in Atlantic Margin Basins - Final report

Combining Ar-Ar dating of K-feldspar overgrowths with fluid inclusion temperature data to reconstruct burial histories and fluid flow in UK Atlantic margin basins