Search results

Filter by

Remove filters

158 results found

Modern workplaces [consultation]: government response on flexible parental leave. Impact assessment.

Data supporting the impact assessment for proposals on extending flexible parental leave in the closed consultation on modern workplaces (URN 11/699). The new system of flexible parental leave aims...

ITECC end user devices

Information on DECC IT equipment

Hackney Article 4 Directions - Flexible Town Centre Use

Article 4 Direction (A4D) is part of planning legislation that allows the Council to remove permitted development rights including changes of use from an area or a particular property. This dataset...

Number of publicly available EV charging DEVICES (may have more than one charging connector) recorded on ZapMap – Rapid chargers

Number of publicly available EV charging DEVICES (may have more than one charging connector) recorded on ZapMap – Rapid chargers

Number of publicly available EV charging DEVICES (may have more than one charging connector) recorded on ZapMap - All speeds

Number of publicly available EV charging DEVICES (may have more than one charging connector) recorded on ZapMap - All speeds

Quantitative and qualitative data relating to the inhibition of a phosphatase reaction by microcystin on a paper-based analytical device (PAD)

This dataset contains information about the development of a paper analytical device for the detection of the microcystin toxin. Water samples were collected weekly from Rostherne Mere and Tatton...

UKCCSRC Call 1 project blog: Flexible CCS Network Development, Update, 06.03.14

This is a blog (Update, 06.03.14) on the UKCCSRC Call 1 project, Flexible CCS Network Development. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project blog: Flexible CCS Network Development, Workshop1, 30.04.14

This is a blog (Workshop1, 30.04.14) on the UKCCSRC Call 1 project, Flexible CCS Network Development. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Cranfield Biannual, 22.04.15

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 22.04.15. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project poster: Flexible CCS Network Development, Cambridge Biannual, 02.04.14

This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cambridge Biannual, 02.04.14. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project poster: Flexible CCS Network Development, Cranfield Biannual, 21.04.15

This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 21.04.15. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Workshop1, 30.04.14

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Workshop1, 30.04.14. Grant number: UKCCSRC-C1-40.

Rate of publicly available EV charging DEVICES (may have more than one charging connector) recorded on ZapMapper 100,000 population – Rapid chargers

Rate of publicly available EV charging DEVICES (may have more than one charging connector) recorded on ZapMapper 100,000 population – Rapid chargers

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Workshop1ES, 30.04.14

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Workshop1ES, 30.04.14. Grant number: UKCCSRC-C1-40.

Rate of publicly available EV charging DEVICES (may have more than one charging connector) recorded on ZapMap per 100,000 population - All speeds

Rate of publicly available EV charging DEVICES (may have more than one charging connector) recorded on ZapMap per 100,000 population - All speeds

UKCCSRC Call 1 Project: FleCCSnet - Flexible CCS Network Development

This project will produce and disseminate the first design and operating guidelines for the flexible operation of CCS pipeline networks. The research will explore how CCS pipeline networks can...

Flexible Resourcing Records

Recruitment - matching skills profiles and availability to identify candidates with the right skills.

Flexible Deployment Tool

Timesheet allocation of hours on variety of projects. Competency Self-Assessments. Only name, position and time allocations & self-assessments held within.

UKCCSRC Call 2 project poster: Towards more flexible power generation with CCS, Cranfield Biannual, 21.04.15

This poster on the UKCCSRC Call 2 project, Towards more flexible power generation with CCS, was presented at the Cranfield Biannual, 21.04.15. Grant number: UKCCSRC-C2-214.

UKCCSRC Call 2 project poster: Flexible CCS operations combined with online solvent monitoring: A pilot-scale study, CSLF Call project poster reception, London, 27.06.16

This poster on the UKCCSRC Call 2 project Flexible CCS operations combined with online solvent monitoring: A pilot-scale study was presented at the CSLF Call project poster reception, London,...