Filter by
Remove filters
1,902
results found
- Published by:
- Environmental Information Data Centre
- Last updated:
- 21 January 2026
This dataset contains first egg dates for great tits (Parus major) and blue tits (Cyanistes caeruleus) from Monks Wood, Brampton Wood and Wennington Wood in Cambridgeshire, England, over a 23 year...
- Published by:
- Environmental Information Data Centre
- Last updated:
- 21 January 2026
This dataset comprises multiple baseline and future ensembles of hydrological model estimates of monthly mean and annual maximum river flows (m3s-1) on a 0. 0.008333° × 0. 0.008333° grid...
- Published by:
- Marine Environmental Data & Information Network
- Last updated:
- 10 July 2024
This survey was undertaken by Cefas as part of the South Western Beam Trawl
Survey, Qtr 1 (FSS: Q1SWBEAM);
Annual research vessel surveys in the Western English Channel using 4m beam
trawls in...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Scottish Government SpatialData.gov.scot
- Last updated:
- 19 June 2024
The spawning grounds of haddock (Melanogrammus aeglefinus) layer has been generated to identify the likely distribution of haddock spawning in the North Sea and West of Scotland, taking account of...
- Published by:
- Joint Nature Conservation Committee
- Last updated:
- 17 May 2018
This is a map of the coastal physiographic type 'Sealoch'. The polygons represent sealochs, glacially-formed inlets (fjords, fjards) of western Scotland and Ireland, including the voes of Shetland....
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 15 March 2024
This report is a contribution to the Strategic Environmental Assessment (SEA6) conducted by the Department of Trade and Industry (now Department of Energy and Climate Change). This report...
- Published by:
- Office for National Statistics
- Last updated:
- 22 August 2018
This report brings together under one cover a wide range of statistics that are currently available on the construction industry. It gives a broad perspective of statistical trends in the...