Search results

Filter by

Remove filters

2,958 results found

Saved Local Plan Policy E15 - Possible cycle routes

Sites allocated for Possible cycle routes under the Saved Local Plan policy E15. Areas recorded as polylines. Upon accessing this Licensed Data you will be deemed to have accepted the terms of the...

Local Planning Document - Policy LPD 58 - National Cycle Route

Local Planning Document - Policy LPD 58 - National Cycle Route

One-year survival from all cancers (CCGOIS 1.10)

One-year net survival for adults diagnosed with cancer (aged 15 - 99 years), 95% confidence intervals. Current version updated: Mar-17 Next version due: Mar-18

2018, Shell UK Ltd, Pierce Pipeline Route Survey - Pierce to Curlew DGD, Pipeline/Cable Route Survey, DECC Reference Number GS_709

An oil and gas industry pipeline route site survey acquired under licences P2189, P1937, P188, P2395, P1588, P2455, P2390, P114 between April and May 2018. The block numbers traversed were 23/27,...

Children with one or more decayed, missing or filled teeth

Children with one or more decayed, missing or filled teeth

GM bus routes (1:25,000 scale map data)

This dataset consists of map files which show bus routes covering the Greater Manchester area. The dataset is available in MapInfo .tab, Google .kml, and ESRI .shp file formats. Please...

One O'Clock Clubs

shows the location of childrens services in lambeth

2006, Talisman Sinopec Energy (UK) Ltd, Pipeline Route Survey Burghley UKCS Block 16/22, Pipeline/Cable Route Survey, BGS Reference Number TB06SS0005

An oil and gas industry site survey for a pipeline/cable route acquired between July and September 2006. The block numbers traversed were 15/25, 16/21 and 16/22.

Bathymetry, Maritime Limits and Boundaries, and Ships' Routeing Measures in UK EEZ

### Over 4000 Bathymetry surfaces, Maritime Limits and Boundaries and Ships' Routeing Measures are available on the ADMIRALTY Marine Data Portal. The ADMIRALTY Marine Data Portal provides access...

HS2 Phase Two proposed line of route consultation

GIS shapefile data presenting the July 2013 consultation alignments, stations and depots for the proposed HS2 Phase Two proposed line of route between the West Midlands and the East Midlands,...

JSA Claimants: % of Working Age Population (16-64) (Over one year)

JSA Claimants: % of Working Age Population (16-64) (Over one year)

Important Navigation Routes defining boundary of policy PS2 in the East Inshore and East Offshore marine plans

The data to define the extent of policy PS2 in the East Inshore and East Offshore marine plans was based on identification of important navigation routes. Important navigation routes are areas...

Woking Borough Council Brownfield Land Register Part One 2020

Woking Borough Council's Brownfield Land Register (Part 1) comprises all brownfield sites that the Council has assessed as being appropriate for residential development. The register is produced to...

2002, BP Exploration, Rhum Development, Pipeline/Cable Route Survey, BGS Reference Number BP02SS0004

An oil and gas industry site survey for a pipeline/cable route (Rhum - Bruce Pipeline Route) acquired between July and August 2002. The block numbers traversed were 3/29, 9/4 and 9/9.

Walk NI Routes in Causeway Coast and Glens Borough Council

Walking Routes throughout Causeway Coast and Glens Borough Council area.For more information visit: http://www.walkni.com/Alternatively, CLICK HERE to download your free copy of...

BGS bedrock geology (OneGeology download service WFS 2.0)

This service is the BGS contribution to the OneGeology project, providing UK onshore bedrock geological data at 1:625 000 scale. This map data is collected as part of an ongoing BGS project:...

Routing Hazard

These are locations which are hazardous, and caution should be taken to ensure safe travel. Hazards are usually signed using the warning sign through a red triangle.

Routing Structure

These indicate the location of key structures related to the highway network. These may be: Barriers: Structures or equipment constructed to control, obstruct, or prevent passage or access Bridges...

One-year survival from all cancers (NHSOF 1.4.i)

A measure of the number of adults diagnosed with any type of cancer in a year who are still alive one year after diagnosis. Purpose This indicator attempts to capture the success of the NHS in...

Cancer Registration: National Cancer Patient Experience Survey Wave 2 by patient characteristics and route to diagnosis

The English Cancer Patient Experience Survey (CPES) is commissioned by NHS England and administered on their behalf by an external survey provider organisation (Quality Health). The survey...