Skip to main content

Filters

6,381 to 6,400 of 17,384 results
  • Woodland Grant Scheme 3 England

    Publisher
    Forestry Commission
    Updated
    26 June 2026
    The Woodland Grant Scheme (WGS) provided incentives for people to create and manage woodlands on sites all over Great Britain. The Forestry Commission paid grants for establishing and looking...
  • DNPA Wild Camping Permitted

    Publisher
    Dartmoor National Park Authority
    Updated
    24 June 2026
    Backpack camping is permitted on some of Dartmoor’s commons (please check the camping map on the DNPA website - https://www.dartmoor.gov.uk/about-us/about-us-maps/camping-map Click the Backpack...
  • Climate Change Allowances - Peak River Flow by Management Catchment

    Publisher
    Environment Agency
    Updated
    18 September 2026
    This dataset contains peak river flow allowances showing the anticipated changes to peak flow by management catchment. It contains information generated by UK Centre for Ecology and Hydrology...
  • basildon_cs2012_padc6

    Publisher
    Basildon Borough Council
    Updated
    3 January 2018
    The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
  • basildon_cs2012_padc10

    Publisher
    Basildon Borough Council
    Updated
    3 January 2018
    The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
  • basildon_cs2012_padc1

    Publisher
    Basildon Borough Council
    Updated
    3 January 2018
    The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
  • basildon_cs2012_padc12

    Publisher
    Basildon Borough Council
    Updated
    3 January 2018
    The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
  • basildon_cs2012_padc11

    Publisher
    Basildon Borough Council
    Updated
    3 January 2018
    The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
  • basildon_cs2012_padc13

    Publisher
    Basildon Borough Council
    Updated
    3 January 2018
    The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
  • basildon_cs2012_padc2

    Publisher
    Basildon Borough Council
    Updated
    3 January 2018
    The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
  • basildon_cs2012_padc3

    Publisher
    Basildon Borough Council
    Updated
    3 January 2018
    The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
  • basildon_cs2012_padc4

    Publisher
    Basildon Borough Council
    Updated
    3 January 2018
    The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
  • basildon_cs2012_padc7

    Publisher
    Basildon Borough Council
    Updated
    3 January 2018
    The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
  • basildon_cs2012_padc5

    Publisher
    Basildon Borough Council
    Updated
    3 January 2018
    The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
  • basildon_cs2012_padc8

    Publisher
    Basildon Borough Council
    Updated
    3 January 2018
    The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
  • basildon_cs2012_padc9

    Publisher
    Basildon Borough Council
    Updated
    3 January 2018
    The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
  • Mineral resource records (Mr); Scotland and Northern England.

    Publisher
    British Geological Survey (BGS)
    Updated
    20 November 2026
    The collection, amounting to c.6,000 records, consists of reports and data relating to geochemical sampling, geophysics, drilling and field mapping deposited by mineral exploration companies...
  • Chimney Meadow (Church Field) soil water retention measurements (pF curves)

    Publisher
    Environmental Information Data Centre
    Updated
    18 September 2026
    Soil moisture and Electrical Resistivity Tomography (ERT) measurements within the top metre of soil at Church Field, Chimney Meadow National Nature Reserve. Church Field lies on a clay lens which...
  • UKCCSRC Call 1 project poster: 3D Mapping of Large-Scale Subsurface Flow Pathways using Nanoseismic Monitoring, CSLF Call project poster reception, London, 27.06.16

    Publisher
    British Geological Survey (BGS)
    Updated
    20 November 2026
    This poster on the UKCCSRC Call 1 project 3D Mapping of Large-Scale Subsurface Flow Pathways using Nanoseismic Monitoring was presented at the CSLF Call project poster reception, London, 27.06.16....
  • WWNP Woodland Constraints

    Publisher
    Environment Agency
    Updated
    7 April 2026
    This dataset has been produced as part of the Mapping Potential for Working with Natural Processes research project (SC150005). The project created a toolbox of mapped data and methods which...