Search results

Filter by

Remove filters

4,992 results found

Indicative site capacity toolkit

The Indicative Site Capacity Toolkit has been developed as part of Optimising Site Capacity: A Design-led Approach London Plan Guidance to assist in determining the indicative site capacity of...

Detection surge capacity

Improving chemical analysis and detection surge capacity using Liquid Chromatography Mass Spectrometry (LCMS)

Indicative residential capacity calculators

Indicative residential capacity calculators to be used with the Good Quality Homes for All Londoners draft for consultation.

School Capacity Projections

This data shows Actual and Projected Pupil Numbers and Capacity of Schools by local authority district. 'Actual' figures provided are based on October school census data for the relevant year of...

Remaining Landfill Capacity

Datasets for remaining landfill capacity by site in England at the end of the calendar year. Data is available for 2015-2024 on this record. Permitted landfill operators have a condition in...

Available Water Capacity, Scotland WMS

The proportion of water held in the soil at field capacity (5KPa) and at the permanent wilting point (1500kPa) was calculated for each soil horizon of each soil taxonomic unit (soil series)...

Decentralised Energy Capacity Study

Data analysis to support the London Decentralised Energy Capacity Study The London Decentralised Energy Capacity Study presents the findings of a regional assessment of the potential for renewable...

Wind Energy Capacity Study

The council, together with Scottish Natural Heritage have commissioned Consultant Landscape Architects to update the Argyll and Bute Landscape Wind Energy Capacity Study 2012. The study provides...

Adding Capacity at Heathrow Consultation

Database of responses to the Adding Capacity at Heathrow Airport consultation. Data collection ceased. This database was used to inform an ongoing policy/consultative exercise....

Northern Powergrid - Demand and Capacity Data

Data from Northern Powergrid shows the full area covered by the company and maps demands, fault levels, capacities and generation of substations. Conditions of use included.

Feed in Tariff scheme capacity data

This publication has now been discontinued. Quarter 1 2012 was the final edition of this publication. Source agency: Energy and Climate Change Designation: National Statistics Language:...

Soil Series properties within Field Capacity Zones

Wetness class and workability assessment codes derived from the soil series and field capacity zone it occurs in

Catalyst: capacity building and match funding scheme awards

Catalyst capacity building and match funding awards

HLS Target Areas

A set of targeting maps to increase the environmental benefits delivered through Higher Level Stewardship. This data aims to help secure the most appropriate management in geographic areas where...

Mortality Target Monitoring

Mortality monitoring. Source agency: Health Designation: National Statistics Language: English Alternative title: Mortality Target Monitoring

Weekly solar PV installation & capacity statistics

As deployment of solar PV under the FiT scheme has now stabilised the need for weekly statistics has reduced, DECC will therefore no longer be producing weekly solar PV statistics from 2 April...

FRM Target Areas

Flood Risk Management Target Areas (FRM TA's) are a geographical dataset that identifies areas which are the focus of targeted flood risk management objectives and actions, as identified in...

Current and past Net Capacity Figures for schools in York

This dataset includes current and past Net Capacity Figures for schools in York. Net Capacities are calculated from room use and room size of school buildings. For further information and...

Public Sector Apprenticeship Target

This data is published in accordance with the Public Sector Apprenticeship Target. Public Bodies employing more than 250 people are required to have regard to the target of 2.3% of employees being...

Public Sector - apprenticeship targets

The public sector apprenticeship target was introduced by government in April 2017 in accordance with The Public Sector Apprenticeship Targets Regulations 2017.  Public sector bodies,...