Search results

Filter by

Remove filters

397 results found

UKCCSRC Call 1 project blog: Oxyfuel and EGR Processes in GT Combustion, Update, 01.11.13

This is a blog (Update, 01.11.13) on the UKCCSRC Call 1 project, Oxyfuel and EGR Processes in GT Combustion. Grant number: UKCCSRC-C1-26.

UKCCSRC Call 1 project blog: Oxyfuel and EGR Processes in GT Combustion, Final, 01.08.14

This is a blog (Final, 01.08.14) on the UKCCSRC Call 1 project, Oxyfuel and EGR Processes in GT Combustion. Grant number: UKCCSRC-C1-26.

UKCCSRC Call 1 project presentation: Oxyfuel and EGR Processes in GT Combustion, Cranfield Biannual, 22.04.15

This presentation on the UKCCSRC Call 1 project, Oxyfuel and EGR Processes in GT Combustion, was presented at the GasCCS, 25.06.14. Grant number: UKCCSRC-C1-26.

UKCCSRC Call 1 project presentation: Oxyfuel and EGR Processes in GT Combustion, Cardiff Biannual, 11.09.15

This presentation on the UKCCSRC Call 1 project, Oxyfuel and EGR Processes in GT Combustion, was presented at the Cardiff Biannual, 11.09.15. Grant number: UKCCSRC-C1-26.

UKCCSRC Call 1 project presentation: Oxyfuel and EGR Processes in GT Combustion, GasCCS, 25.06.14

This presentation on the UKCCSRC Call 1 project, Oxyfuel and EGR Processes in GT Combustion, was presented at the GasCCS, 25.06.14. Grant number: UKCCSRC-C1-26.

UKCCSRC Call 1 project poster: Oxyfuel and EGR Processes in GT Combustion, Nottingham Biannual, 04.08.13

This poster on the UKCCSRC Call 1 project, Oxyfuel and EGR Processes in GT Combustion, was presented at the Nottingham Biannual, 04.08.13. Grant number: UKCCSRC-C1-26.

UKCCSRC Call 1 project poster: Oxyfuel and EGR Processes in GT Combustion, Sheffield Biannual, 08.04.13

This poster on the UKCCSRC Call 1 project, Oxyfuel and EGR Processes in GT Combustion, was presented at the Sheffield Biannual, 08.04.13. Grant number: UKCCSRC-C1-26.

Performance Dashboard Applications for Safety Zone consents, required for offshore renewable energy installations

This dashboard shows information about how the Applications for Safety Zone consents, required for offshore renewable energy installations service is currently performing. This is a "beta"...

Maritime and Coastguard Agency (MCA) Bathymetric Survey HI1494, Southwold to Gt Yarmouth, (06/11/2016 to 29/01/2017)

Samples and associated geological data are held at the British Geological Survey for Maritime Coastguard Agency (MCA), Civil Hydrography Programme (CHP), Bathymetric Survey HI1494; Southwold to Gt...

Electric Vehicle Charging Points installed as part of the Coventry and Birmingham Low Emissions Demonstrator (CABLED) project

The locations of public electric vehicle recharging points that have been installed at locations around Birmingham city centre as part of the Coventry and Birmingham Low Emissions Demonstrator...

RHPP1 questionnaire post installation and follow up dataset

Evaluation - Questionnaire responses from RHPP1 recipients

Coastal Biodiversity and Ecosystem Service Sustainability (CBESS) global positioning system (GPS) locations for instruments and features associated with wave monitoring and sedimentation-erosion table installations in saltmarsh and mudflat habitats

The dataset details global positioning system (GPS) locations recorded for instruments and locations of interest associated with equipment installed for the monitoring of wave energy, surface...

Properties receiving ECO, ECO measures installed, Affordable Warmth referrals from ESAS etc.

This data is now located in the Household Energy Efficiency Statistics. They are published monthly on a provisional basis. These statistical datasets are available on .gov.uk and Find Open data....

Number on local authority owned dwellings that received "Capital" type installation, replacement or major repairs

The purpose of the Business Plan Statistical Appendix (BPSA) is to bring together information about a non-Large Scale Voluntary Transfer (LSVT) authority's Housing Revenue Account (HRA) stock. The...

Expenditure on local authority owned dwellings that received Capital type installation, replacement or major repairs (£000s)

The purpose of the Business Plan Statistical Appendix (BPSA) is to bring together information about a non-Large Scale Voluntary Transfer (LSVT) authority's Housing Revenue Account (HRA) stock. The...

UKCCSRC Call 1 project poster: Oxyfuel and EGR Processes in GT Combustion, CSLF Call project poster reception, London, 27.06.16

This poster on the UKCCSRC Call 1 project Oxyfuel and exhaust gas recirculation processes in gas turbine combustion for improved carbon capture performance was presented at the CSLF Call project...

Cambridgeshire County Council Grants Awarded

A record of grants awarded by the County Council, in line with the Local Government Transparency Code

National Statistics UPRN Lookup (March 2022) User Guide

This User Guide contains information about the ONSUD including: directory content; data currency; the methodology for assigning areas to postcodes; data formats; data...

UKCCSRC Call 1 Project: Fault seal controls on storage capacity

Fault risk remains a key parameter in evaluating the potential for trapping CO2 in the subsurface, yet very little is known about the conditions under which CO2 and CO2/hydrocarbon mixtures are...

MCS and ROOFiT statistics

This release was published for the final time in January 2016. The MCS and ROOFiT pipeline statistics show the number of installations each month that are registerd on the Microgeneration...