Search directory

Filter by

3,947 results found

2004, BP Exploration, Clair Phase 2 Appraisal Well 206/8-T, Site Survey, BGS Reference Number BP04SS0005

An oil and gas industry site survey acquired between April and May 2004. The block number traversed was 206/8.

British Geological Survey (BGS) Geophysical Survey 1979/17: Deep Seismic; Northern North Sea (1/Nov/1979 to 27/Nov/1979 and 01/Feb/1980 to 14/Feb/1980)

This high resolution marine multi-channel seismic survey commissioned by the Institute of Geological Sciences on behalf of Department of Energy took place in the Northern North Sea during 1st-27th...

FGS Long Term Forest Plan

This option aims to provide support for the creation of a long-term forest plan that sets out the management objectives for private woodlands. This is for the long-term management of woodlands...

2013, Taqa Bratani Ltd, UMC Cormorant, Semi-Sub Rig, DECC Reference Number 2869

An oil and gas industry site survey for a semi-sub righ acquired under licences P296, P232, P1845 in two phases (Phase 1: 22/10/2012 - 18/11/2012, Phase 1: 15/04/2013 to 12/05/2013). The block...

Tree Preservation Orders areas

Area, Group or Woodland Tree Preservation Orders (TPOs) within Brecon Beacons National Park. Please note that the Brecon Beacons National Park Authority are in the final stages of reviewing all...

Tree Preservation Orders individual

Individual Tree Preservation Orders (TPOs) within Brecon Beacons National Park. Please note that the Brecon Beacons National Park Authority are in the final stages of reviewing all of the Tree...

2022, ONE-Dyas UK Ltd, UKCS Block 42/15a Crosgan Phase II, Exploration Drilling Survey, DECC Reference Number GS_1483

An oil and gas industry exploration drilling site survey acquired under licence P2500 in December 2022. The block number traversed was 42/15a.

Marine Aggregate Levy Sustainability Fund (MALSF) Geophysical and Multibeam Survey 2009/7_MEPF: MALSF Humber Regional Environmental Characterisation Project, Southern North Sea (27/Feb/2009 to 19/Mar/2009)

This BGS led survey, conducted by Gardline took place between Oct2008 and Mar2009 in 3 phases. The first 2 phases were conducted aboard the Gardline MV Vigilant. The first phase was completed due...

Severn Estuary High Tide Waterbird Roost Sites (Clevedon to Oldbury and Bridgwater Bay)

Identification of wintering waterbird high tide roosts on the Severn Estuary SSSI/SPA completed in four phases:Phase 1 includes the Brean Down to Clevedon stretch. Phases 2 & 3 were completed...

Severn Estuary High Tide Waterbird Roost Sites (Gloucestershire)

Identification of wintering waterbird high tide roosts on the Severn Estuary SSSI/SPA completed in four phases:Phase 1 includes the Brean Down to Clevedon stretch. Phases 2 & 3 were completed...

Severn Estuary High Tide Waterbird Roost Sites (Brean Down to Clevedon)

Identification of wintering waterbird high tide roosts on the Severn Estuary SSSI/SPA completed in four phases:Phase 1 includes the Brean Down to Clevedon stretch. Phases 2 & 3 were completed...

Severn Estuary High Tide Waterbird Roost Sites (Steart Marshes in Bridgwater Bay)

Identification of wintering waterbird high tide roosts on the Severn Estuary SSSI/SPA completed in four phases:Phase 1 includes the Brean Down to Clevedon stretch. Phases 2 & 3 were completed...

Marine Aggregate Levy Sustainability Fund (MALSF) Geophysical and Multibeam Survey 2008/5_MEPF: MALSF Humber Regional Environmental Characterisation Project, Southern North Sea (14/Oct/2008 to 18/Feb/2009)

This BGS led survey, conducted by Gardline took place between Oct2008 and Mar2009 in 3 phases. The first 2 phases were conducted aboard the Gardline MV Vigilant. The first phase was completed due...

HS2 Ecological Survey Data

The data provided here relates to ecological survey data that has been collected since 2012 as part of the environmental statement, construction and delivery of HS2 Phase One (London to West...

Information for each Carbon Reduction Commitment (CRC) participant

The CRC Order 2013 provides for publication of information on the basis of participants' annual reports plus details submitted when they registered for the scheme. The CRC Energy Efficiency Scheme...

2015 Scottish Natural Heritage (SNH) North Rona sea caves site condition monitoring survey

The purpose of this survey of North Rona SAC sea caves, undertaken on the 18th August 2015, was to initiate site condition monitoring (SCM). The objectives of SCM were to establish a baseline...

2015 Scottish Natural Heritage (SNH) North Rona sea caves site condition monitoring survey

The purpose of this survey of North Rona SAC sea caves, undertaken on the 18th August 2015, was to initiate site condition monitoring (SCM). The objectives of SCM were to establish a baseline...

Dataset of linepacking times for CO2 pipelines

This dataset provides the linepacking times that have been generated for a set of pipeline dimensions, flow rates, lengths and pressure conditions. This work has been funded by the UK Carbon...

A73-Littoral Biotope Survey and Condition Assessment of the Lynher Estuary SSSI 2010

A Natural England commissioned verification survey. Littoral biotope survey and condition assessment of the Lynher Estuary SSSI. The purpose of the study was to establish a physical and biological...

NERC Project: QICS - Quantifying and monitoring environmental impacts of geological carbon storage (2010 - 2014)

QICS (Quantifying and monitoring environmental impacts of geological carbon storage) was a program funded by the Natural Environment Research Council (NERC), with support from the Scottish...