Important

We're planning improvements to this service. Help us learn what to change by completing a short survey.

Search results

Filter by

Remove filters

3,921 results found

UK Ocean Acidification Research programme data set

The cross-disciplinary themes will result in a diverse data catalogue. The ship collected data will be in the form of sea surface meteorology (2-D wind speed and direction, total irradiance,...

Rayleigh wave phase delays and Vsv upper-mantle structure in the Pacific

This repository contains data and inversion results for the SOLA finite-frequency tomography of the Pacific upper-mantle. It is linked to the paper by Latallerie et al., in prep, which follows one...

UKCCSRC Call 2 project data: Gas-liquid two-phase CO2 flow data from a vertical Coriolis meter and a DP transmitter

The data is collected in North China Electric Power University (NCEPU) on a 1-inch bore, gas-liquid two-phase, high pressure (up to 72bar), ambient temperature CO2 flow test rig from 19th May to...

Characterization results of the synthesis of iron sulfide phases (NERC grant NE/J008745/1)

Data produced from NERC Grant NE/J008745/1. Grant Abstract: Iron sulfides are widespread in the environment, where they regulate and control the global geochemical iron and sulfur cycles. However,...

STREET CLEANING - % of standard cleansing cases resolved within SLA (3 days) - (YTD) (SLA set in 2016)

STREET CLEANING - % of standard cleansing cases resolved within SLA (3 days) - (YTD) (SLA set in 2016)

STREET CLEANING - % of urgent cleansing cases resolved within SLA (2 hours) - (YTD) (SLA set in 2016)

STREET CLEANING - % of urgent cleansing cases resolved within SLA (2 hours) - (YTD) (SLA set in 2016)

GRAFFITI - Number of offensive issues dealt with that breached SLA target time (SLA set in 2016)

GRAFFITI - Number of offensive issues dealt with that breached SLA target time (SLA set in 2016)

UKCCSRC Call 1 project presentation: Multi-Phase Flow Modelling for Hazardous Assessment, Cranfield Biannual, 22.04.15

This presentation on the UKCCSRC (UK Carbon Capture and Storage Research Centre) Call 1 project, Multi-Phase Flow Modelling for Hazardous Assessment, was presented at the Cranfield Biannual,...

UKCCSRC Call 1 project poster: Multi-Phase Flow Modelling for Hazardous Assessment, Cambridge Biannual, 02.04.14

This poster on the UKCCSRC (UK Carbon Capture and Storage Research Centre) Call 1 project, Multi-Phase Flow Modelling for Hazardous Assessment, was presented at the Cambridge Biannual, 02.04.14....

UKCCSRC Call 1 project poster: Multi-Phase Flow Modelling for Hazardous Assessment, Cranfield Biannual, 21.04.15

This poster on the UKCCSRC (UK Carbon Capture and Storage Research Centre) Call 1 project, Multi-Phase Flow Modelling for Hazardous Assessment, was presented at the Cranfield Biannual, 21.04.15....

Cost effective methods to measure extent and condition of habitats: Earth Observation Phase 3

Report contains data that can be used under Open Government Licence. Phase 1 of the Making Earth observation work for conservation series of research projects created the Crick Framework, which...

2014 Natural England Phase I Sediment Verification Survey of the Alde, Ore and Butley SAC and rMCZ

Survey name:2014 Natural England Phase I Sediment Verification Survey of the Alde, Ore and Butley SAC and rMCZ This is a collation of surveys to gather data and evidence from a variety of marine...

2014 Natural England Phase II Sediment Verification Survey of the Alde, Ore and Butley SAC and rMCZ

Survey name: 2014 Natural England Phase II Sediment Verification Survey of the Alde, Ore and Butley SAC and rMCZ This is a collation of surveys to gather data and evidence from a variety of marine...

GRAFFITI - Number of non-offensive issues dealt with that breached SLA target time (SLA set in 2016)

GRAFFITI - Number of non-offensive issues dealt with that breached SLA target time (SLA set in 2016)

GreenbeltWithinGateshead_Phase1

Greenbelt - Gateshead - 2015

LocalWildlifeSites_Phase1

Local Wildlife Sites- Gateshead - 2015

GreenbeltWithinGateshead_Phase2

Greenbelt - Gateshead - 2015

PrimarySchoolCatchments_Phase2

Primary School Catchments - Gateshead - 2015

TreePreservationOrders_Phase2

Tree Preservation Orders - Gateshead - 2015

LocalWildlifeSites_Phase2

Local Wildlife Sites- Gateshead - 2015