Filter by
343
results found
- Published by:
- Environment Agency
- Last updated:
- 07 April 2026
This is a polygon dataset showing Water Framework Directive (WFD) Transitional (Estuary) and Coastal Water Bodies.
This dataset provides attribution relating to the 2019 classification results, as...
- Published by:
- Joint Nature Conservation Committee
- Last updated:
- 17 May 2018
The Dart Estuary is situated on the south coast of Devon and opens into Start Bay. The estuary itself runs through a steep sided channel from Totnes, some 18 km to the north, to Dartmouth and...
- Published by:
- Joint Nature Conservation Committee
- Last updated:
- 17 May 2018
The Dart Estuary is situated on the south coast of Devon and opens into Start Bay. The estuary itself runs through a steep sided channel from Totnes, some 18 km to the north, to Dartmouth and...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
Our proposed research is based on cores collected during the recent, and very successful, Integrated Ocean Drilling Program (IODP) Expedition 340. The aims of this expedition were to investigate...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
Linear features (shown as polylines) in BGS Geology 50k are used to portray geological features and concepts that are normally depicted on maps in linear form, rather than polygonal form. The data...
- Published by:
- Joint Nature Conservation Committee
- Last updated:
- 17 May 2018
The survey area is the eastern shore of Liverpool Bay, and consists of an almost unbroken expanse of sandy beaches. The area is bounded to the north by Morecambe Bay and to the south by the Mersey...
- Published by:
- Joint Nature Conservation Committee
- Last updated:
- 17 May 2018
This report of a survey carried out under contract to the NCC, describes the shores of Lewis from Mealista on the west coast, north to the Butt of Lewis and south down the east coast as far as the...
- Published by:
- Joint Nature Conservation Committee
- Last updated:
- 17 May 2018
The survey area is the eastern shore of Liverpool Bay, and consists of an almost unbroken expanse of sandy beaches. The area is bounded to the north by Morecambe Bay and to the south by the Mersey...
- Published by:
- Joint Nature Conservation Committee
- Last updated:
- 17 May 2018
This report of a survey carried out under contract to the NCC, describes the shores of Lewis from Mealista on the west coast, north to the Butt of Lewis and south down the east coast as far as the...
- Published by:
- Joint Nature Conservation Committee
- Last updated:
- 17 May 2018
The massive limestone promontory of Berry Head is probably the most impressive outcrop of Devonian limestone in south Devon. Forming the southern tip of Torbay, the head shelters the fishing port...
- Published by:
- Joint Nature Conservation Committee
- Last updated:
- 17 May 2018
The massive limestone promontory of Berry Head is probably the most impressive outcrop of Devonian limestone in south Devon. Forming the southern tip of Torbay, the head shelters the fishing port...
- Published by:
- Joint Nature Conservation Committee
- Last updated:
- 17 May 2018
The Solent system is situated midway along the English channel on the Hampshire and Sussex coasts, and is bounded on its southern side by the Isle of Wight. It includes the Eastern and Western arms...
- Published by:
- Joint Nature Conservation Committee
- Last updated:
- 17 May 2018
The Solent system is situated midway along the English channel on the Hampshire and Sussex coasts, and is bounded on its southern side by the Isle of Wight. It includes the Eastern and Western arms...
- Published by:
- Ministry of Housing, Communities and Local Government
- Last updated:
- 26 February 2018
Planning applications decided by district level planning authority and type of development
District level planning is undertaken by metropolitan and non-metropolitan districts, unitary...
- Published by:
- Ministry of Housing, Communities and Local Government
- Last updated:
- 26 February 2018
Planning applications decided by district level planning authority and outcome
District level planning is undertaken by metropolitan and non-metropolitan districts, unitary authorities, national...
- Published by:
- Ministry of Housing, Communities and Local Government
- Last updated:
- 26 February 2018
Planning applications decided by district level planning authority and speed of decision
District level planning is undertaken by metropolitan and non-metropolitan districts, unitary authorities,...
- Published by:
- Ministry of Housing, Communities and Local Government
- Last updated:
- 26 February 2018
Planning applications decided by district level planning authority and type of development
District level planning is undertaken by metropolitan and non-metropolitan districts, unitary...
- Published by:
- Ministry of Housing, Communities and Local Government
- Last updated:
- 26 February 2018
Planning applications decided by district level planning authority and outcome.
District level planning is undertaken by metropolitan and non-metropolitan districts, unitary authorities, national...
- Published by:
- Ministry of Housing, Communities and Local Government
- Last updated:
- 26 February 2018
The number of planning applications granted as a percentage of all major and minor schemes
#### How the figure is calculated:
The number of planning applications for major or minor schemes...
- Published by:
- Northumberland County Council
- Last updated:
- 29 May 2026
For the Local Nature Recovery Strategy (LNRS) which was adopted in March 2026. This layer represents opportunities for nature recovery within the wider countryside, outside of the measures in Stage...