Filter by
4,221
results found
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
This is a blog (Workshop1, 30.04.14) on the UKCCSRC Call 1 project, Flexible CCS Network Development. Grant number: UKCCSRC-C1-40.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
This is the final report of the Natural Analogues for the Geological Storage of CO2 in the Geological Environment (NASCENT) project. The NASCENT project has studied natural accumulations of carbon...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cambridge Biannual, 02.04.14. Grant number: UKCCSRC-C1-40.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 21.04.15. Grant number: UKCCSRC-C1-40.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 22.04.15. Grant number: UKCCSRC-C1-40.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Workshop1, 30.04.14. Grant number: UKCCSRC-C1-40.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
This presentation on the UKCCSRC Call 1 project, UK Bio-CCS CAP, was presented at the Cranfield Biannual, 22.04.15. Grant number: UKCCSRC-C1-38.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
This presentation on the UKCCSRC Call 1 project, UK Bio-CCS CAP, was presented at the Cardiff Biannual, 10.09.14. Grant number: UKCCSRC-C1-38.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
This poster on the UKCCSRC Call 1 project, UK Bio-CCS CAP, was presented at the Cranfield Biannual, 22.04.15. Grant number: UKCCSRC-C1-38.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
This presentation on the UKCCSRC Call 1 project, North Sea aquifer mapping, was presented at the Cambridge Biannual, 02.04.14. Grant number: UKCCSRC-C1-30.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
This presentation on the UKCCSRC Call 1 project, North Sea aquifer mapping, was presented at the Cranfield Biannual, 22.04.15. Grant number: UKCCSRC-C1-30.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
This poster on the UKCCSRC Call 1 project, North Sea aquifer mapping, was presented at the Cranfield Biannual, 22.04.15. Grant number: UKCCSRC-C1-30.
- Published by:
- Marine Environmental Data & Information Network
- Last updated:
- 16 February 2025
The CreamT project converted the prototype WireWall wave overtopping field measurement system into a ruggedised monitoring system between August 2020 and August 2023. The system was deployed for up...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
The SACS Best Practice Manual consists of two parts. The first part outlines the operational experiences gained during the Sleipner CO2 injection operation. The second part consists of...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
This dataset relates to the scientific journal article "A pilot-scale study of dynamic response scenarios for the flexible operation of post-combustion CO2 capture" (Tait et al. 2016), a study...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
This poster on the UKCCSRC Call 1 project CO2 storage in Palaeogene and Neogene hydrogeological systems of the North Sea: preparation of an IODP scientific drilling bid was presented at the CSLF...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
Fault risk remains a key parameter in evaluating the potential for trapping CO2 in the subsurface, yet very little is known about the conditions under which CO2 and CO2/hydrocarbon mixtures are...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
This service is a BGS contribution to the OneGeology project, providing UK onshore bedrock geological data at 1:625 000 scale in GeoSciML. This map data is collected as part of an ongoing BGS...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
This poster on the UKCCSRC Call 2 project Shelter and Escape in the Event of a Release of CO2 from CCS Infrastructure (S-CAPE) was presented at the CSLF Call project poster reception, London,...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
This poster on the UKCCSRC Call 2 project Measurement of Water Solubility Limits of CO2 Mixtures to Underpin the Safe Pipeline Transportation of CO2 was presented at the CSLF Call project poster...