Search directory

Filter by

3,664 results found

UKCCSRC Call 1 project blog: Flexible CCS Network Development, Workshop1, 30.04.14

This is a blog (Workshop1, 30.04.14) on the UKCCSRC Call 1 project, Flexible CCS Network Development. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Cranfield Biannual, 22.04.15

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 22.04.15. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Workshop1, 30.04.14

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Workshop1, 30.04.14. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project poster: Flexible CCS Network Development, Cambridge Biannual, 02.04.14

This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cambridge Biannual, 02.04.14. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project poster: Flexible CCS Network Development, Cranfield Biannual, 21.04.15

This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 21.04.15. Grant number: UKCCSRC-C1-40.

% of children who have achieved a Good Level of Development (GLD) at Foundation Stage - (Snapshot)

% of children who have achieved a Good Level of Development (GLD) at Foundation Stage - (Snapshot)

Hip fracture: Proportion of patients recovering to their previous levels of mobility / walking ability at 30 days (NHSOF 3.5.i)

The proportion of patients, expressed as a percentage, with a hip fracture recovering to their previous levels of mobility at 30 days. Purpose This indicator aims to measure how effectively...

Hip fracture: proportion of patients recovering to their previous levels of mobility/walking ability at 120 days (CCGOIS 3.10.ii)

The proportion of patients aged 60 and over with a hip fracture recovering to their previous levels of mobility at 120 days after admission to hospital, expressed as a percentage with 95%...

Hip fracture: proportion of patients recovering to their previous levels of mobility/walking ability at 30 days (CCGOIS 3.10.i)

The proportion of patients aged 60 and over with a hip fracture recovering to their previous levels of mobility at 30 days after admission to hospital, expressed as a percentage with 95% confidence...

Hip fracture: Proportion of patients recovering to their previous levels of mobility / walking ability at 120 days (NHSOF 3.5.ii)

The proportion of patients, expressed as a percentage, with a hip fracture recovering to their previous levels of mobility at 120 days. Purpose This indicator aims to measure how effectively...

Optimizing Road Development for Groundwater Recharge and Retention (NERC grant NE/L001934/1)

Data files and reports from NERC grant NE/L001934/1, Optimizing Road Development for Groundwater Recharge and Retention. 1. Optimizing Intensified Runoff from Roads for Supplemental Irrigation:...

Planning Permissions Submitted to the London Development Database by Month

The number of permissions added to the LDD by month as an indicator of activity in the planning system. This is the number of planning permissions added to the London Development Database (LDD) by...

GREEN_BELT_RELEASE_DEVELOPMENT_SITES

Regeneration areas in Dacorum Borough Council

Development Control Orders - Article 4

Article 4 directions are used to control works that could threaten the character of an area of acknowledged importance, such as a conservation area. Dataset as of 26.6.15.

Limit of Sustainable Residential Development

This dataset consists of the boundaries of all Areas of Potential Intensification (API) within the London Borough of Sutton. APIs (formerly called sustainable residential quality or SRQ areas) are...

Ministerial gifts, hospitality, travel and meetings with external organisations in the Department for International Development

The following lists the ministerial gifts (both received and given), hospitality, travel and meetings with external organisations for ministers within the Department for International Development.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Workshop1ES, 30.04.14

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Workshop1ES, 30.04.14. Grant number: UKCCSRC-C1-40.

% of Talkabout panel who agree that to develop their career need to commute out of York

% of Talkabout panel who agree that to develop their career need to commute out of York

% of Talkabout panel who disagree that to develop their career need to commute out of York

% of Talkabout panel who disagree that to develop their career need to commute out of York

Conservation and development investments in the Corridor Ankeniheny-Zahamena (CAZ), Madagascar, 2007-2014

Conservation and development investments in the Ankeniheny-Zahamena Corridor (CAZ) includes information on investment type, implementing agency, and timing and location of investments. Data were...