Search directory

Filter by

36,063 results found

Survey : CIRO 10/96 (part of North Sea Groundfish Survey, Qtr 4 (FSS: IBTS4E))

This survey was undertaken by Cefas as part of the North Sea Groundfish Survey, Qtr 4 (FSS: IBTS4E); Approximately 70 core trawl stations are completed annually to provide distribution and stock...

A&E weekly data

The total number of attendances in the week for all A&E types, including Minor Injury Units and Walk-in Centres, and of these, the number discharged, admitted or transferred within four hours...

A&E weekly data

The total number of attendances in the week for all A&E types, including Minor Injury Units and Walk-in Centres, and of these, the number discharged, admitted or transferred within four hours...

Saved Local Plan Policy E9 - Parking Guidelines

Dataset showing Parking Guidelines under Policy E9 of the Saved Local Plan 2006. Areas are recorded as a polygon. Upon accessing this Licensed Data you will be deemed to have accepted the terms of...

CS Policy SP4B

Area subject to Spatial Policy 4B in the Core Strategy Development Plan Document (CS DPD)

Saved Local Plan Policy C8 - Dalton Town Centre

Dataset showing Dalton Town Centre under Policy C8 of the Saved Local Plan 2006. Areas are recorded as a polygon. Upon accessing this Licensed Data you will be deemed to have accepted the terms of...

4-8 Sedgemere Road EA Consultation Documents

North Sea Groundfish Survey, Qtr 4 (FSS: IBTS4E)

Approximately 70 core trawl stations are completed annually to provide distribution and stock composition estimates for fish species. Station, catch, length (all species) and biological data...

Saved Local Plan Policy B8 - Residential Protection Areas

Sitea allocated for Residential Protection Areas under the Saves Local Plan policy B8. Areas are recorded as a polygon. Upon accessing this Licensed Data you will be deemed to have accepted the...

% of other applications determined within 8 Weeks (NPI157c)

% of other applications determined within 8 Weeks (NPI157c) *This indicator has been discontinued

E4: Protection of Existing Employment Sites

Article 4 B1 to C3

shows the boundaries and locations of heritage assets in lambeth

% of non-major applications determined within 8 Weeks (NPI157b)

% of non-major applications determined within 8 Weeks (NPI157b)

Survey : CLIO/8B/1963 (part of CEFAS Historic surveys)

This survey was undertaken by Cefas as part of the CEFAS Historic surveys; Station and biological data collected during research surveys carried out by Cefas (formerly Directorate of Fisheries)...

Survey : CIRO/8B/1971 (part of CEFAS Historic surveys)

This survey was undertaken by Cefas as part of the CEFAS Historic surveys; Station and biological data collected during research surveys carried out by Cefas (formerly Directorate of Fisheries)...

NI 108e - Key Stage 4 attainment for black and minority ethnic groups

Key Stage 4 is the stage of the National Curriculum between ages 14 and 16 years. This indicator relates to examinations taken at the end of the Key Stage. Minority ethnic groups measured for the...

Individual Savings Accounts Main Tables 9.4

Provides information on savings in adult and junior Individual Savings Accounts - the number of individuals subscribing to ISAs and market values of ISAs. Source agency: HM Revenue and...

% of infants who received a 6-8 week review by the time they were 8 weeks

% of infants who received a 6-8 week review by the time they were 8 weeks

A&E Attendances and Emergency Admissions Quarterly Report

POSTPONED due to resource issues. We plan to publish a report covering 2014/15 quarters 1 and 2 on 17 October 2014. Please note that this postponement relates to the narrative report only. The...

2014, Statoil, ST14306 Mariner Area Block 8/15 and 9/11, Semi-Sub Rig, DECC Reference Number GS_122

An oil and gas industry site survey for a semi-sub rig acquired under licences E437,P1758,P335 in July 2014. The block numbers traversed were 8/15, 9/11.