Search directory

Filter by

3,812 results found

Species point records from 1988 MNCR minor south-coast inlets in England survey

The survey area was on the south coast of Britain, and was divided into four sections:- 1. the harbour and estuary at Yarmouth, at the western end of the Isle of Wight, 2. sections of the shore at...

UKCCSRC Call 1 project poster: Flexible CCS Network Development, Cambridge Biannual, 02.04.14

This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cambridge Biannual, 02.04.14. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project poster: Flexible CCS Network Development, Cranfield Biannual, 21.04.15

This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 21.04.15. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Cranfield Biannual, 22.04.15

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 22.04.15. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Workshop1, 30.04.14

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Workshop1, 30.04.14. Grant number: UKCCSRC-C1-40.

% of children who have achieved a Good Level of Development (GLD) at Foundation Stage - (Snapshot)

% of children who have achieved a Good Level of Development (GLD) at Foundation Stage - (Snapshot)

Article 4 2 Direction

Article 4 (2) Directions provide controls over minor development by removing certain permitted development rights within conservation areas. Generally they only apply to dwellings and to external...

Optimizing Road Development for Groundwater Recharge and Retention (NERC grant NE/L001934/1)

Data files and reports from NERC grant NE/L001934/1, Optimizing Road Development for Groundwater Recharge and Retention. 1. Optimizing Intensified Runoff from Roads for Supplemental Irrigation:...

Planning Permissions Submitted to the London Development Database by Month

The number of permissions added to the LDD by month as an indicator of activity in the planning system. This is the number of planning permissions added to the London Development Database (LDD) by...

GREEN_BELT_RELEASE_DEVELOPMENT_SITES

Regeneration areas in Dacorum Borough Council

Development Control Orders - Article 4

Article 4 directions are used to control works that could threaten the character of an area of acknowledged importance, such as a conservation area. Dataset as of 26.6.15.

Limit of Sustainable Residential Development

This dataset consists of the boundaries of all Areas of Potential Intensification (API) within the London Borough of Sutton. APIs (formerly called sustainable residential quality or SRQ areas) are...

Ministerial gifts, hospitality, travel and meetings with external organisations in the Department for International Development

The following lists the ministerial gifts (both received and given), hospitality, travel and meetings with external organisations for ministers within the Department for International Development.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Workshop1ES, 30.04.14

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Workshop1ES, 30.04.14. Grant number: UKCCSRC-C1-40.

% of Talkabout panel who agree that to develop their career need to commute out of York

% of Talkabout panel who agree that to develop their career need to commute out of York

% of Talkabout panel who disagree that to develop their career need to commute out of York

% of Talkabout panel who disagree that to develop their career need to commute out of York

Percentage of quarterly residential planning decisions completed within 13 weeks

Planning authorities' planning applications and decisions, type of authority, speed of decision, type and size of development, enforcement action, regulation 3 and 4 consents, applications for...

Percentage of other quarterly planning decisions completed within 8 weeks

Planning authorities' planning applications and decisions, type of authority, speed of decision, type and size of development, enforcement action, regulation 3 and 4 consents, applications for...

Quarterly major residential planning decisions

Planning authorities' planning applications and decisions, type of authority, speed of decision, type and size of development, enforcement action, regulation 3 and 4 consents, applications for...

Other annual planning decisions

Planning authorities' planning applications and decisions, type of authority, speed of decision, type and size of development, enforcement action, regulation 3 and 4 consents, applications for...