Search directory

Filter by

814 results found

Pupil attainment at GCSE by location of pupil residence

Key Stage 4 (GCSE/GNVQ) results for young people by gender in England: Referenced by location of pupil residence Source: Department for Children Schools and Families (DCSF): National Pupil...

Thames Estuary 2100 Policy Unit boundaries

The Thames Estuary is divided into 23 geographical areas, known as the Policy Units. Each Policy Unit has been assessed to determine the appropriate level of flood risk management. This is the...

Temporal data on the construction and operation start dates of UK offshore wind farms 2003 to 2018

The temporal patterns of offshore wind farm (OWF) activity during the installation of the turbine foundations were examined using data from 2003 to 2018, a timeframe over which the UK’s OWFs have...

Atomic Force Microscopy images of surface nanobubbles on the carbonate mineral dolomite (NERC grant NE/M011429/1)

Non-contact Atomic Force Microscopy images (NC-AFM) of surface nanobubbles on the carbonate mineral dolomite. Since surface nanobubbles were first imaged in 2000, they have been of growing interest...

basildon_cs2012_billericaytowncentre

The dataset was used in the development of the Core Strategy 2012 and shows the rough area of Billericay Town...

basildon_open_space_sportcentres

The dataset shows the area of Sports Centres used in the Basildon Borough Open Space Assessment. Public Sector End User Licence –...

Settlement Boundaries

Urban and Rural Settlement Boundaries within the Kettering Borough based on the Local Plans. For personal, non-commercial use only. Upon accessing this Licensed Data you will be deemed to have...

basildon_open_space_naturalandseminaturalspaces

The dataset shows the area of Natural and Semi Natural Open Spaces used in the Basildon Borough Open Space...

basildon_cs2012_majorurbanarea

The dataset was used in the development of the Core Strategy 2012 and shows the rough boundaries of Major Urban Area of Basildon...

ICT contracts over £10,000, Department for Education (2010)

As part of the transparency agenda, the Department for Education is publishing all new information and communications technology (ICT) contracts over the value of £10,000 in 2010. When calling-off...

sea_amenity_sites_2008

The sustainable environmental assessment defined where development within Basildon Borough met other developments. This layer isolated the known amenity sites for this period...

Quality Of Life

Each year a survey called 'Quality of Life in Your Neighbourhood' is carried out. Bristol residents are asked to help monitor the Quality of Life in Bristol. The information provided from this...

% of Talkabout panel who agree that they can influence decisions in their local area

% of Talkabout panel who agree that they can influence decisions in their local area This is a measure of the Talkabout panel members who agree that they can influence decisions in their local...

NYMNPA This Exploited Land of Iron Project Area

Supported by the Heritage Lottery Fund, North York Moors National Park Authority, David Ross Foundation and other partners The landscape area is 18,252 hectares. The current delivery period runs...

basildon_cs2012_padc6

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc10

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc1

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc12

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc11

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc13

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...