Search directory

Filter by

4,243 results found

Rural Development Programme for England (RDPE) Delivery ヨ North East (Lancaster House, Newcastle)

Paper files - relate to Rural Development Programme for England (RDPE) grants which have been awarded. Contain all the information relating to the business/ farmers who hold the projects, also...

Payments to suppliers with a value over £500 from London Thames Gateway Development Corporation

Payments to suppliers with a value over £500 from London Thames Gateway Development Corporation for period of April 2011 to September 2011

Maritime and Coastguard Agency (MCA) Bathymetric Survey HI1363, Inner Approaches to the Firth of Lorne, (08/08/2011 to 12/03/2012)

Samples and associated geological data are held at the British Geological Survey for Maritime Coastguard Agency (MCA), Civil Hydrography Programme (CHP), Bathymetric Survey HI1363; Inner Approaches...

Maritime and Coastguard Agency (MCA) Bathymetric Survey HI1083, Eastern Approaches to the Firth of Forth, (01/05/2005 to 01/08/2005)

Samples and associated geological data are held at the British Geological Survey for Maritime Coastguard Agency (MCA), Civil Hydrography Programme (CHP), Bathymetric Survey HI1083; Eastern...

UKCCSRC Call 1 project blog: Flexible CCS Network Development, Workshop1, 30.04.14

This is a blog (Workshop1, 30.04.14) on the UKCCSRC Call 1 project, Flexible CCS Network Development. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project poster: Flexible CCS Network Development, Cambridge Biannual, 02.04.14

This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cambridge Biannual, 02.04.14. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project poster: Flexible CCS Network Development, Cranfield Biannual, 21.04.15

This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 21.04.15. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Cranfield Biannual, 22.04.15

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 22.04.15. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Workshop1, 30.04.14

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Workshop1, 30.04.14. Grant number: UKCCSRC-C1-40.

British Geological Survey (BGS) Sampling Survey 1976/76: Regional Mapping Programme Drilling: SW Approaches and Northern Scotland (01/Apr/1976 to 15/Aug/1976)

This British Geological Survey (BGS) regional marine sampling survey took place from April to August 1976 in SW Approaches and Northern Scotland on board the MV Sealab. Seabed samples and borehole...

% of children who have achieved a Good Level of Development (GLD) at Foundation Stage - (Snapshot)

% of children who have achieved a Good Level of Development (GLD) at Foundation Stage - (Snapshot)

UKCCSRC Call 2 Project: Novel reductive rejuvenation approaches for degraded amine solutions from PCC in power plants

Aqueous amine scrubbing was originally developed for natural gas treatment and is currently considered to be the current best available technology for post-combustion capture (PCC) of CO2 from both...

Optimizing Road Development for Groundwater Recharge and Retention (NERC grant NE/L001934/1)

Data files and reports from NERC grant NE/L001934/1, Optimizing Road Development for Groundwater Recharge and Retention. 1. Optimizing Intensified Runoff from Roads for Supplemental Irrigation:...

Planning Permissions Submitted to the London Development Database by Month

The number of permissions added to the LDD by month as an indicator of activity in the planning system. This is the number of planning permissions added to the London Development Database (LDD) by...

GREEN_BELT_RELEASE_DEVELOPMENT_SITES

Regeneration areas in Dacorum Borough Council

Development Control Orders - Article 4

Article 4 directions are used to control works that could threaten the character of an area of acknowledged importance, such as a conservation area. Dataset as of 26.6.15.

Limit of Sustainable Residential Development

This dataset consists of the boundaries of all Areas of Potential Intensification (API) within the London Borough of Sutton. APIs (formerly called sustainable residential quality or SRQ areas) are...

Ministerial gifts, hospitality, travel and meetings with external organisations in the Department for International Development

The following lists the ministerial gifts (both received and given), hospitality, travel and meetings with external organisations for ministers within the Department for International Development.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Workshop1ES, 30.04.14

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Workshop1ES, 30.04.14. Grant number: UKCCSRC-C1-40.

% of Talkabout panel who agree that to develop their career need to commute out of York

% of Talkabout panel who agree that to develop their career need to commute out of York