Search directory

Filter by

4,624 results found

UKCCSRC Call 1 project blog: Flexible CCS Network Development, Update, 06.03.14

This is a blog (Update, 06.03.14) on the UKCCSRC Call 1 project, Flexible CCS Network Development. Grant number: UKCCSRC-C1-40.

Spend over £25,000 in Agriculture and Horticulture Development Board (AHDB)

A monthly-updated list of all financial transactions spending over £25,000 made by Agriculture and Horticulture Development Board (AHDB), as part of the Government's commitment to transparency in...

Planning permissions on the London Development Database (LDD)

The London Development Database (LDD) has been replaced by the Planning London Datahub (PLD) and the data on this page is no longer being updated.The LDD recorded significant planning permissions...

NI 170 - Previously developed land that has been vacant or derelict for more than 5 years

Proportion of the area of developed land that is vacant or derelict. The total area of developed land is the area recorded for the relevant local authority for 2001 in the urban land figures...

Personal Social Services: Adults Receiving Community Equipment and Minor Adaptations

The User Experience Survey Programme operates on an annual basis and is used to target areas of particular interest within Adult Social Services. Opinions are sought over a range of service areas...

LPS Call handling stats and LPS Offices in-person visits

LPS Call Handling Stats 2018-2027

Local Development Plan - Local Nature Conservation Sites - Argyll and Bute

Locally important sites for wildlife or nature interests identified in the Argyll and Bute adopted Local Development Plan 2015. They have been judged to be important because: (A) the site supports...

Rural Development Programme for England (RDPE) Delivery ヨ North East (Lancaster House, Newcastle)

Paper files - relate to Rural Development Programme for England (RDPE) grants which have been awarded. Contain all the information relating to the business/ farmers who hold the projects, also...

Payments to suppliers with a value over £500 from London Thames Gateway Development Corporation

Payments to suppliers with a value over £500 from London Thames Gateway Development Corporation for period of April 2011 to September 2011

UKCCSRC Call 1 project blog: Flexible CCS Network Development, Workshop1, 30.04.14

This is a blog (Workshop1, 30.04.14) on the UKCCSRC Call 1 project, Flexible CCS Network Development. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Cranfield Biannual, 22.04.15

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 22.04.15. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Workshop1, 30.04.14

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Workshop1, 30.04.14. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project poster: Flexible CCS Network Development, Cambridge Biannual, 02.04.14

This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cambridge Biannual, 02.04.14. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project poster: Flexible CCS Network Development, Cranfield Biannual, 21.04.15

This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 21.04.15. Grant number: UKCCSRC-C1-40.

% of children who have achieved a Good Level of Development (GLD) at Foundation Stage - (Snapshot)

% of children who have achieved a Good Level of Development (GLD) at Foundation Stage - (Snapshot)

Visual Compartments Landscape Sensitivity and Capacity for Wind Farm Development on The Shetland Islands 2009

GIS Data from the Landscape Sensitivity and Capacity Study for Wind Farm Development on The Shetland Islands Report 2009

Optimizing Road Development for Groundwater Recharge and Retention (NERC grant NE/L001934/1)

Data files and reports from NERC grant NE/L001934/1, Optimizing Road Development for Groundwater Recharge and Retention. 1. Optimizing Intensified Runoff from Roads for Supplemental Irrigation:...

Planning Permissions Submitted to the London Development Database by Month

The number of permissions added to the LDD by month as an indicator of activity in the planning system. This is the number of planning permissions added to the London Development Database (LDD) by...

Limit of Sustainable Residential Development

This dataset consists of the boundaries of all Areas of Potential Intensification (API) within the London Borough of Sutton. APIs (formerly called sustainable residential quality or SRQ areas) are...

GREEN_BELT_RELEASE_DEVELOPMENT_SITES

Regeneration areas in Dacorum Borough Council