Search directory

Filter by

4,507 results found

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Cranfield Biannual, 22.04.15

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 22.04.15. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Workshop1, 30.04.14

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Workshop1, 30.04.14. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project poster: Flexible CCS Network Development, Cambridge Biannual, 02.04.14

This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cambridge Biannual, 02.04.14. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project poster: Flexible CCS Network Development, Cranfield Biannual, 21.04.15

This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 21.04.15. Grant number: UKCCSRC-C1-40.

Biodiversity, environmental and social data 2007-2008 for the project Improving the Success of Agri-environment Schemes (FarmCAT)

This dataset consists of butterfly and bumblebee counts, winter bird counts, number of flowering units, and seed mass data, along with categories of soil type and quality, and temperature data....

% of children who have achieved a Good Level of Development (GLD) at Foundation Stage - (Snapshot)

% of children who have achieved a Good Level of Development (GLD) at Foundation Stage - (Snapshot)

Delayed transfers of care from hospital which are attributable to adult social care, per 100,000 population (New definition from 2017/18) - (YTD Average)

Delayed transfers of care from hospital which are attributable to adult social care, per 100,000 population - (YTD Average) A delayed transfer is when a patient is ready to leave hospital...

Visual Compartments Landscape Sensitivity and Capacity for Wind Farm Development on The Shetland Islands 2009

GIS Data from the Landscape Sensitivity and Capacity Study for Wind Farm Development on The Shetland Islands Report 2009

Optimizing Road Development for Groundwater Recharge and Retention (NERC grant NE/L001934/1)

Data files and reports from NERC grant NE/L001934/1, Optimizing Road Development for Groundwater Recharge and Retention. 1. Optimizing Intensified Runoff from Roads for Supplemental Irrigation:...

Planning Permissions Submitted to the London Development Database by Month

The number of permissions added to the LDD by month as an indicator of activity in the planning system. This is the number of planning permissions added to the London Development Database (LDD) by...

Limit of Sustainable Residential Development

This dataset consists of the boundaries of all Areas of Potential Intensification (API) within the London Borough of Sutton. APIs (formerly called sustainable residential quality or SRQ areas) are...

GREEN_BELT_RELEASE_DEVELOPMENT_SITES

Regeneration areas in Dacorum Borough Council

Development Control Orders - Article 4

Article 4 directions are used to control works that could threaten the character of an area of acknowledged importance, such as a conservation area. Dataset as of 26.6.15.

Ministerial gifts, hospitality, travel and meetings with external organisations in the Department for International Development

The following lists the ministerial gifts (both received and given), hospitality, travel and meetings with external organisations for ministers within the Department for International Development.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Workshop1ES, 30.04.14

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Workshop1ES, 30.04.14. Grant number: UKCCSRC-C1-40.

% of Talkabout panel who agree that to develop their career need to commute out of York

% of Talkabout panel who agree that to develop their career need to commute out of York

% of Talkabout panel who disagree that to develop their career need to commute out of York

% of Talkabout panel who disagree that to develop their career need to commute out of York

NI 133 - Timeliness of social care packages

Acceptable waiting times for delivery of care packages following assessment: For new clients aged 65+, the percentage for whom the time from completion of assessment to provision of services in the...

NI 132 - Timeliness of social care assessment

Acceptable waiting times for assessments: For new clients, the percentage from where the time from first contact to completion of assessment is less than or equal to four weeks. Source: Referrals,...

NI 132 - Timeliness of social care assessment

Acceptable waiting times for assessments: For new clients, the percentage from where the time from first contact to completion of assessment is less than or equal to four weeks.