Search directory

Filter by

719 results found

National Forest Trial (Barton 1999)

A series of species trials were set up to investigate the establishment and early growth (up to 14 years old) of 44 native and non-native tree species on a variety of different site types in...

Community Forest Species Trial (Bagworth Heath 1999)

A series of species trials were set up to investigate the establishment and early growth (up to 14 years old) of 44 native and non-native tree species on a variety of different site types in...

Community Forest Species Trial (Rockbeare 1998)

A series of species trials were set up to investigate the establishment and early growth (up to 14 years old) of 44 native and non-native tree species on a variety of different site types in...

Community Forest Species Trial (Aldewood 1999)

A series of species trials were set up to investigate the establishment and early growth (up to 14 years old) of 44 native and non-native tree species on a variety of different site types in...

2024, Natural Power Consultants Ltd, Thanet Offshore Wind Farm, Benthic Survey

Within the Environmental Statement (ES) for the development of the Thanet OWF, Thanet Offshore Wind Limited committed to undertaking three post-construction monitoring surveys over a ten-year...

Crime Rates in the Metropolitan Police area by Ward

Crime Rates of offences per thousand population, by broad crime grouping, by financial year for wards. Offences: These are confirmed reports of crimes being committed. All data relates to...

Crime rates by London Borough

Numbers of recorded offences, and rates of offences per thousand population, by broad crime grouping, by financial year and borough. Rate is given as per thousand population, and are calculated...

Community forest species trial (St Neots 1999)

A series of species trials were set up to investigate the establishment and early growth (up to 14 years old) of 44 native and non-native tree species on a variety of different site types in...

National Forest Species Trial (Church Gresley 1999)

A series of species trials were set up to investigate the establishment and early growth (up to 14 years old) of 44 native and non-native tree species on a variety of different site types in...

Nature Recovery Projects (England)

This dataset defines the boundaries of twelve Nature Recovery Projects forming a key part of the 25 Year Environment Plan’s commitment to deliver the Nature Recovery Network (NRN). The twelve...

QICS Paper: Detection of CO2 leakage from a simulated sub-seabed storage site using three different types of pCO2 sensors

This work is focused on results from a recent controlled sub-seabed in situ carbon dioxide (CO2) release experiment carried out during May–October 2012 in Ardmucknish Bay on the Scottish west...

Department for Environment, Food and Rural Affairs (DEFRA) MCZ: North West Jones Bank: Multibeam, Benthic Sampling and Video survey NWJB_6_2012: Western Channel & Celtic Sea (27/02/2012 to 31/03/2012)

Gardline Geosurvey Limited was contracted by Cefas to survey for the recommended Marine Conservation Zone (rMCZ), Lot 6, North West Jones Bank. Survey work was conducted in March 2012. The object...

Phytophthora ramorum SF Policy Zones

This dataset shows the policy zones defined in Scottish Forestry's Phytophthora ramorum (P. ramorum) Action Plan and introduced in 2021. There are two zones; a priority action zone, and a risk...

Tree Preservation Orders - Aberdeenshire

*Whilst TPOs are a legal requirement they may not always be digitised accurately. Users of this data should not assume this data is totally accurate and should consult the specific local authority...

Numbers of Patients Registered at a GP Practice

PLEASE NOTE: Following the consultation on the proposal to stop producing this report, it has been confirmed that this report will continue to be produced by NHS Digital. The format in which it...

Direct testing of forsterite bicrystals via in-situ micropillar experiments at 700 deg C (NERC Grant NE/S00162X/1)

The mechanics of olivine deformation play a key role in long-term planetary processes, including the response of the lithosphere to tectonic loading or the response of the solid Earth to tidal...

Energy Savings Opportunity Scheme

The Energy Savings Opportunity Scheme (ESOS) applies to large undertakings operating in the UK. The rules relating to the scheme are set out in the Energy Savings Opportunity Scheme Regulations...

Calderdale IMD 2025 results

The Index of multiple deprivation (IMD) combines information from the English Indices of deprivation (IoD). It is the Government's official measure of relative deprivation for LSOAs (Lower layer...

Pollution Incidents Summary

PLEASE NOTE: We have removed this dataset as ownership of the data within it no longer sits with a single organisation. The Environment Agency is currently working on a revised version of this...

Impact indicator: energy efficiency of new build housing

Average Standard Assessment Procedure energy rating score #### How the figure is calculated: The sum of SAP energy rating scores for each new home for which an energy performance certificate has...