Search directory

Filter by

6,522 results found

EPSRC project presentation: DiSECCS - Diagnostic Seismic Toolbox for the Efficient Control of CO2Storage, Sheffield Biannual, 4 April 2013

This presentation on the EPSRC project, DiSECCS, was presented at the Cranfield Biannual, 8.04.13. Grant number: Grant number: EP/K035878/1.

EPSRC project presentation: ORGMEMT - Organic Mixed Matrix Membrane Technologies for Post-Combustion CO2 Capture, Cranfield Biannual, 21 April 2015

This presentation on the EPSRC project, Organic Mixed Matrix Membrane Technologies (ORGMEMT) for Post-Combustion CO2 Capture, Cranfield Biannual, was presented at the Cranfield Biannual, 21.04.15....

EU Projects: SACS/SACS2 - Saline Aquifer CO2 Storage - An Offshore Demonstrations at the Sleipner Field

The SACS and SACS2 projects ran sequentially from 1998 to 2002, with the aim of developing research into the potential for large-scale storage of CO2 in underground saline aquifer formations. SACS...

2013 onwards, Sussex Inshore Fisheries and Conservation Authority (IFCA), Hastings, underwater video project

Sussex Inshore Fisheries and Conservation Authority (IFCA), funded by Natural England and in collaboration with the University of Brighton and Hastings Fishermen's Protection Society (HFPS), used...

2013 onwards, Sussex Inshore Fisheries and Conservation Authority (IFCA), Hastings, underwater video project

Sussex Inshore Fisheries and Conservation Authority (IFCA), funded by Natural England and in collaboration with the University of Brighton and Hastings Fishermen's Protection Society (HFPS), used...

Shrink-swell hazard potential for Great Britain based on CHESS-SCAPE climate projections, from 2030s to 2070s. (PREMIUM version: 50m resolution)

This dataset identifies areas of shrink-swell hazard with increased potential due to changing climatic conditions based on climate variables from 3 CHESS-SCAPE Representative Concentration Pathway...

UKCCSRC Call 2 Project: Multiscale characterisation of CO2 storage in the United Kingdom

This is a partnership between Imperial College London and the British Geological Survey in which we combine our expertise in pore scale digital rock physics (DRP), reservoir condition Special Core...

Phytoplankton abundance data for the POSEIDON project in the Celtic Seas and English Channel for autumn 2012 to 2016

The POSEIDON project ran an annual autumn pelagic survey in the English Channel, Celtic Sea and Bristol Channel running from 2012-2016 on the RV Cefas Endeavour. This dataset comprises...

21st Century Exploration RoadMap (21CXRM) Palaeozoic Petroleum Systems Analysis Project Products

Reports, images, GIS and gridded products describing the Palaeozoic geology and conventional petroleum systems of parts of the UK offshore. Devonian and Carboniferous rocks are the focus in and...

UKCCSRC Call 1 Project: Microseismic and structural geological data collected at Aquistore (Canada)

This data set includes microseismic and structural geological data collected at Aquistore (Canada). They cover a period from 26th April - 21st June 2015, during which CO2 was being injected in the...

UKCCSRC Call 1 project presentations: Mixed matrix membranes preparation for post combustion carbon capture (Jul 2015 to Jun 2016)

Posters and presentations from the UKCCSRC Call 1 Project: Mixed matrix membranes for post combustion carbon capture (Mar 2013 to Dec 2015). Membrane processes are a promising alternative to the...

British Geological Survey (BGS) Multibeam Survey 2015/4 Tyne Catchment Project: Belhaven, Dunbar (15/Jun/2015 to 23/Jun/2015)

This marine multibeam survey took place from 15/06/2015 - 23/06/2015 in the area off Belhaven Beach near Dunbar, The Lothians, on board the RV White Ribbon. The survey was carried out by the...

Digital Data from the Land Beneath the Sea Palaeolandscapes Project (Unpath'd Waters), 2016-2024

This collection comprises of text, spreadsheet and GIS data from The Unpath'd Waters Palaeolandscapes Data Package, which was compiled from multiple sources between 2016 and 2024 and serves as the...

UKCCSRC Call 1 project presentation and video: UK Bio-CSS CAP, SUPERGEN Bioenergy Hub Annual Assembly 2014, 5/11/2014, Birmingham

This presentation on the UKCCSRC Call 1 project, UK Bio-CCS CAP, was presented at the Cranfield Biannual, 22.04.15. Grant number: UKCCSRC-C1-38. Video available at https://vimeo.com/111747716.

UKCCSRC Call 1 Project: Multiphase flow modelling for risk assessment of dense phase CO2 pipelines containing impurities

This project will develop and experimentally validate a heterogeneous flow model for predicting the transient depressurisation and outflow following the puncture of dense phase CO2 pipelines...

UKCCSRC Call 1 Project: BIO-CAP-UK - Air/Oxy Biomass Combustion with CO2 Capture Technology

To accelerate progress towards achieving operational excellence for flexible, efficient and environmentally sustainable Bio-CCS thermal power plants by developing and assessing fundamental...

Soil moisture data for four sites from a study of the impact of woodland on water resources (TADPOLE project, Clipstone)

In 1996 concerns were raised, in the Environment Select Committee’s first report on water conservation and supply, that the government’s ambition to double woodland cover in England could...

UKCCSRC Call 1 Project: 3D mapping of large-scale subsurface flow pathways using nanoseismic monitoring

The project will three-dimensionally image hydraulically conductive features in the reservoir, caprock and overburden of an active CO2 injection site: the Aquistore site, Canada. Our research will...

2014 NERC Marine Renewable Energy Knowledge Exchange Project. Ecosystem services mapping in the Severn estuary and inner Bristol Channel

The study aimed to assess and map the delivery of key ecosystem services (ES) within the greater Severn estuary and Bristol Channel. The project aimed to provide a tool for stakeholders, regulators...

2014 NERC Marine Renewable Energy Knowledge Exchange Project. Ecosystem services mapping in the Severn estuary and inner Bristol Channel

The study aimed to assess and map the delivery of key ecosystem services (ES) within the greater Severn estuary and Bristol Channel. The project aimed to provide a tool for stakeholders, regulators...