Filter by
453
results found
- Published by:
- Ordnance Survey
- Last updated:
- 16 April 2025
OS Open Built Up Areas represents the built up areas of Great Britain and contains three unique datasets, offering maximum flexibility to meet your needs: Built Up Areas, Built Up Extents and Non...
- Published by:
- Office for National Statistics
- Last updated:
- 12 December 2013
Contributing to output in the construction industry publcation
- Published by:
- City of London
- Last updated:
- 24 April 2025
Polygon dataset of all tall buildings (buildings over 50m AOD in height) in the City. Polygons determined by building footprint or site boundary for proposed buildings. More detail provided in the...
- Published by:
- Office for National Statistics
- Last updated:
- 12 December 2013
Used to publish new orders in the construction industry
- Published by:
- Home Office
- Last updated:
- 14 November 2017
The police transformation fund is intended to transform policing by investing in digitalisation, a diverse and flexible workforce and new capabilities to respond to changing crimes and...
- Published by:
- Runnymede Borough Council
- Last updated:
- 30 April 2026
Dataset displaying open spaces in Runnymede. This includes parks & gardens, outdoor sports facilities, amenity green spaces, play areas and more (Last updated- year 2025).
This dataset has...
- Published by:
- Greater London Authority
- Last updated:
- 24 June 2026
The Embedded Capacity Register (ECR), formerly known as the System Wide Resource Register (SWRR), lists all generation, storage and flexible demand resources where the installed generation...
- Published by:
- Office for National Statistics
- Last updated:
- 12 December 2013
Annual Survey of businesses, covering production, construction, distribution and service industries.
- Published by:
- Cambridgeshire Insight
- Last updated:
- 30 June 2014
The East of England Forecasting Model projects economic, demographic and housing trends in a consistent fashion. It covers a wide range of variables, and is designed to be flexible so that...
- Published by:
- Cambridgeshire Insight
- Last updated:
- 23 August 2018
The East of England Forecasting Model projects economic, demographic and housing trends in a consistent fashion. It covers a wide range of variables, and is designed to be flexible so that...
- Published by:
- City of London
- Last updated:
- 29 October 2024
Data shows information on development, construction and refurbishments for schemes to be completed
- Published by:
- Greater London Authority
- Last updated:
- 24 June 2026
The DNOA output shows future network constraints, the recommended solution and the current status in the solution progress. It indicates when, where and at what volume flexibility services will be...
- Published by:
- Greater London Authority
- Last updated:
- 24 June 2026
Number of cases of common mental health problems per 1000 of the population aged 16-74 by type of mental health problem. Data on rates are presented as total cases per 1000 population aged 16-74....
- Published by:
- Department for Business, Energy and Industrial Strategy
- Last updated:
- 01 August 2016
NB Responsibility for the production of PCIs transferred to the Office for National Statistics (ONS) on 1 April 2015. See:...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
This study was carried out jointly by the University of Birmingham and the British Geological Survey. The report addresses the feasibility of using novel quantum-technology-based gravity sensors to...
- Published by:
- London Borough of Brent
- Last updated:
- 10 February 2016
HS2 Safeguarding Zone is the area protected from development which would affect the construction or use of HS2.
- Published by:
- Ordnance Survey
- Last updated:
- 10 January 2025
Polygon feature representing a manmade construction that is not a building. Examples include a mast, a chimney, and a crane.
- Published by:
- Department for Business, Energy and Industrial Strategy
- Last updated:
- 24 August 2022
The Renewable Energy Planning Database (REPD) tracks the progress of renewable energy projects from planning application, through to consent, construction and operation.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...
- Published by:
- City of London
- Last updated:
- 03 January 2024
Businesses looking to locate in the City of London who need a flexible, short-term office solution serviced office space or co-working space could provide the perfect solution. The attached...