Search directory

Filter by

4,850 results found

UKCCSRC Call 1 project blog: Flexible CCS Network Development, Update, 06.03.14

This is a blog (Update, 06.03.14) on the UKCCSRC Call 1 project, Flexible CCS Network Development. Grant number: UKCCSRC-C1-40.

Planning permissions on the London Development Database (LDD)

The London Development Database (LDD) has been replaced by the Planning London Datahub (PLD) and the data on this page is no longer being updated. The LDD recorded significant planning permissions...

Spend over £25,000 in the Department for Transport and its arms-length bodies

The Department for Transport (DFT) has published monthly consolidated files of invoice payments; grant payments, and other payment transactions in accordance with the Prime Minister’s requirements...

NI 170 - Previously developed land that has been vacant or derelict for more than 5 years

Proportion of the area of developed land that is vacant or derelict. The total area of developed land is the area recorded for the relevant local authority for 2001 in the urban land figures...

Local Development Plan - Local Nature Conservation Sites - Argyll and Bute

Locally important sites for wildlife or nature interests identified in the Argyll and Bute adopted Local Development Plan 2015. They have been judged to be important because: (A) the site supports...

Rural Development Programme for England (RDPE) Delivery ヨ North East (Lancaster House, Newcastle)

Paper files - relate to Rural Development Programme for England (RDPE) grants which have been awarded. Contain all the information relating to the business/ farmers who hold the projects, also...

Water chemistry and greenhouse gas emissions of UK water bodies, 2021-2022, from the LOCATE project

This dataset comprises water chemistry data for dissolved organic carbon (DOC), total dissolved nitrogen (TdN), total phosphorus (TP), soluble reactive phosphorus (SRP), absorbance at 254nm (Abs...

Payments to suppliers with a value over £500 from London Thames Gateway Development Corporation

Payments to suppliers with a value over £500 from London Thames Gateway Development Corporation for period of April 2011 to September 2011

UKCCSRC Call 1 project blog: Flexible CCS Network Development, Workshop1, 30.04.14

This is a blog (Workshop1, 30.04.14) on the UKCCSRC Call 1 project, Flexible CCS Network Development. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project poster: Flexible CCS Network Development, Cambridge Biannual, 02.04.14

This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cambridge Biannual, 02.04.14. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project poster: Flexible CCS Network Development, Cranfield Biannual, 21.04.15

This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 21.04.15. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Workshop1, 30.04.14

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Workshop1, 30.04.14. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Cranfield Biannual, 22.04.15

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 22.04.15. Grant number: UKCCSRC-C1-40.

% of children who have achieved a Good Level of Development (GLD) at Foundation Stage - (Snapshot)

% of children who have achieved a Good Level of Development (GLD) at Foundation Stage - (Snapshot)

Taxonomic data, neuropil volume measurements, and mushroom body calyx kenyon cell and synapse counts for Heliconiini butterflies, Central and South America, 2012-2016

This dataset contains taxanomic and neuropil volume measurements of wild caught heliconiine butterflies, as well as kenyon cell and synapse counts in the mushroom body calyx of insectory -reared...

Optimizing Road Development for Groundwater Recharge and Retention (NERC grant NE/L001934/1)

Data files and reports from NERC grant NE/L001934/1, Optimizing Road Development for Groundwater Recharge and Retention. 1. Optimizing Intensified Runoff from Roads for Supplemental Irrigation:...

Planning Permissions Submitted to the London Development Database by Month

The number of permissions added to the LDD by month as an indicator of activity in the planning system. This is the number of planning permissions added to the London Development Database (LDD) by...

GREEN_BELT_RELEASE_DEVELOPMENT_SITES

Regeneration areas in Dacorum Borough Council

Development Control Orders - Article 4

Article 4 directions are used to control works that could threaten the character of an area of acknowledged importance, such as a conservation area. Dataset as of 26.6.15.

Limit of Sustainable Residential Development

This dataset consists of the boundaries of all Areas of Potential Intensification (API) within the London Borough of Sutton. APIs (formerly called sustainable residential quality or SRQ areas) are...