Search directory

Filter by

1,089 results found

Barrow Port Area Action Plan Policy BPSV2 - Spatial Strategy for Port Area Action Plan

Areas affected by policy BPSV2 Spatial Strategy for Port Area Action Plan from the Barrow Port Area Action Plan. Areas are recorded as a polygon. Upon accessing this Licensed Data you will be...

Technology Strategy Board Transparency Data

Required Transparency Data Salary Bands

Strategic Site Allocations Core Strategy 2014 Policies B3A KE3A KE4A RA5

Core Strategy adopted 2014 Policies B3A KE3A KE4A RA5. Defines the boundary of large strategic sites allocated principally for residential development on the edge of Bath, Keynsham and Whitchurch.

Flood risk assessment of the Luanhe river basin under different development strategies and climate scenarios

The dataset describes the data needed for and results produced by the flood risk assessment framework under different development strategies of Luanhe river basin under a changing climate. The...

Comparative transcriptomics of a complex of four European pine species

Data from whole transcriptome sequencing of the four European pine species - Pinus sylvestris (Scots pine), P. mugo (Dwarf mountain pine), P. uliginosa (Mountain pine) and P. uncinata (Peat-bog...

Reduced-complexity aquifer model (NERC grant NE/I022434/1)

Matlab m-file code to generate a probabilistic model of aquifer-body occurrence in the subsurface of the Indo-Gangetic foreland basin, northwestern India. The accompanying ArcGIS ASCII matrix files...

Municipal Recycling and Waste Strategy - Final Consultation Report

As is usual practice, the drafting of a new Strategy has been subject to a formal public consultation.  This report sets out the full findings from the council’s consultation. The findings...

North of Tyne Local Nature Recovery Strategy - Opportunities in the Wider Countryside

For the Local Nature Recovery Strategy (LNRS) which was adopted in March 2026. This layer represents opportunities for nature recovery within the wider countryside, outside of the measures in Stage...

Concentrations of benzene and 1,3-butadiene and exceedances against the Air Quality Strategy criteria at national monitoring network sites: 2006

Concentrations of benzene and 1,3-butadiene and exceedances against the Air Quality Strategy criteria at national monitoring network sites: 2006

North of Tyne Local Nature Recovery Strategy - Stage 5

For the Local Nature Recovery Strategy (LNRS) which was adopted in March 2026. This data forms the Stage 5 mapping which identifies “Areas that could become of particular importance”, or ACIBs,...

Conservation biological control experiments data, 2005-2009 - RELU Re-bugging the system: promoting adoption of alternative pest management strategies in field crop

This set of conservation biological control experiments data was collected as part of five field experiments investigating agricultural biological control techniques, particularly the effect of...

QICS Paper: Marine baseline and monitoring strategies for Carbon Dioxide Capture and Storage (CCS)

The QICS controlled release experiment demonstrates that leaks of carbon dioxide (CO2) gas can be detected by monitoring acoustic, geochemical and biological parameters within a given marine...

Scaling of Fluid Behaviour Associated with Flow Through Complex Geological Structures

PROJECT DETAILS ONLY - NO DATA. This project is designed to integrate geological structural characterisation of fault zones with numerical modelling of flow behaviour at different scales. We will...

Local Flood Risk Management Strategy Area

Warwickshire Count Council has the responsibility to prepare, predict and manage flood risk in the county, following the Flood and Water Management Act 2010 making us a lead local flood authority.

Govt construction strategy elemental cost data

Elemental Cost data that will allow cost modelling and whole life costs to be measured and monitored

Gender Equality Strategy : Baseline Picture Update

Provides a variety of indicators measuring the gender equality situation in Northern Ireland Source agency: Office of the First and Deputy First Minister Designation: Official Statistics not...

Govt construction strategy strategic supplier data

Strategic supplier performance data to allow continuous improvement across government projects

Semiochemical experiment data, 2005-2009 - RELU Re-bugging the system: promoting adoption of alternative pest management strategies in field crop systems

The semiochemical experiment data were collected from novel laboratory, semi-field- and field-scale bioassay experiments taking behavioural observations and counts of pest insects and their natural...

Housing Development Boundaries Local Plan 2007 (Policy HG.4, HG.6), Core Strategy 2014 (Policy B1, KE1, RA1, RA2)

Local Plan adopted 2007 (HG.4, HG.6), Core Strategy adopted 2014 (B1, KE1, RA1, RA2). The boundary which defines that part of certain settlements within which the principle of residential...

Management Strategy Evaluation toolkit for Ecopath with Ecosim (model output and technical report)

This dataset consists of output from a computer model that predicts responses of 69 functional groups from plankton to whales to changing fishing pressure. Scenarios are run using the newly built...