Important

We're planning improvements to this service. Help us learn what to change by completing a short survey.

Search results

Filter by

Remove filters

1,513 results found

Doxford Masterplan

The purpose of this Masterplan is to ensure that the Local Planning Authority has sufficient information on which to make a decision on the key design principles of the Doxford development and once...

East Grampians geological field data

The database contains basic tabulated field data resulting from the work of the BGS East Grampians Project in the early 1980s to mid 1990s. Records include the locations of stations at which field...

Mapping ESOL Provision in Greater London

In February 2017, Learning and Work was commissioned by the Greater London Authority to undertake a mapping exercise of formal and informal provision of English for Speakers of Other Languages...

Locally Important Building Structures

Buildings identified by the Authorities Conservation Officer as being important either historically or to the character of an area, but which have not been formally identified by English Heritage...

Southwick Masterplan

The purpose of this Masterplan is to ensure that the Local Planning Authority has sufficient information on which to make a decision on the key design principles of the Central Southwick...

BGS Publications Database

The BGS Publications Database contains metadata relating to documents created by the British Geological Survey (BGS). These documents include published works (commercially published, formally...

Tree Preservation Orders areas

Area, Group or Woodland Tree Preservation Orders (TPOs) within Brecon Beacons National Park. Please note that the Brecon Beacons National Park Authority are in the final stages of reviewing all...

Tree Preservation Orders individual

Individual Tree Preservation Orders (TPOs) within Brecon Beacons National Park. Please note that the Brecon Beacons National Park Authority are in the final stages of reviewing all of the Tree...

Respond - Independent Case Examiner Complaints Database

Database containing details of clients who have made formal complaints about DWP Agencies and some private sector providers contracted by DWP to deliver services. Information recorded includes:...

Coal Development Low Risk Area

The Development Low Risk area is an area where our records do not indicate the presence of coal mining features at surface or shallow depth which may pose a risk to surface stability or public...

ICT contracts over £10,000, Department for Education (2010)

As part of the transparency agenda, the Department for Education is publishing all new information and communications technology (ICT) contracts over the value of £10,000 in 2010. When calling-off...

HSE Land Use Planning Data

HSE’s consultation zones have been developed to assist HSE in its role as a statutory consultee for planning applications around major hazard sites and major accident hazard pipelines. HSE use the...

Site Allocations

This dataset consists of the boundaries of all site allocations within the London Borough of Sutton which have been formally designated in the adopted Site Development Policies Development Plan...

Tree Preservation Orders - Argyll and Bute

Tree Preservation Orders (TPO) are served by the council to protect individual and groups of trees which are considered of sufficient merit to warrant formal protection either for their...

Cambridgeshire Housing Commitments 2017

Number of formal dwelling commitments at 31/03/2017, which includes those with planning permissions (not yet complete) or those allocated for development. Worksheet includes data by district,...

basildon_cs2012_padc6

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc10

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc1

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc12

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc11

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...