Search directory

Filter by

749 results found

PrimarySchoolCatchments_Phase2

Primary School Catchments - Gateshead - 2015

TreePreservationOrders_Phase2

Tree Preservation Orders - Gateshead - 2015

LocalWildlifeSites_Phase2

Local Wildlife Sites- Gateshead - 2015

NNPA Phase 1 Habitat Survey

Complete coverage of habitat types in Northumberland National Park, originally undertaken in 1992 then digitised later. Subsequently updated with patches of more up-to-date habitat information...

SchoolMainEntrances_Phase2

School Main Entrances - Gateshead - 2015

UrbanCoreBoundary_Phase2

Urban Core - Gateshead - 2015

Camden Cycle Counters Phase 2

Cycling in Camden is becoming ever more popular with the introduction of safe, convenient and protected routes. There are several cycle counters in Camden which provide counts of cyclists along...

Two-phase modeling of water partitioning between liquid iron and silicate melt (NERC Grant NE/S01134X/1)

The two-phase modeling of water between liquid iron and silicate melt at 50 and 135 gigapascals (corresponding to 3500 and 4200 kelvin) was performed by using ab initio molecular dynamics...

UKCCSRC Call 1 project poster: Multi-Phase Flow Modelling for Hazardous Assessment, CSLF Call project poster reception, London, 27.06.16

This poster on the UKCCSRC Call 1 project Multiphase flow modelling for hazard assessment of dense phase CO2 pipelines containing impurities was presented at the CSLF Call project poster reception,...

Characterization results of the synthesis of iron sulfide phases (NERC grant NE/J008745/1)

Data produced from NERC Grant NE/J008745/1. Grant Abstract: Iron sulfides are widespread in the environment, where they regulate and control the global geochemical iron and sulfur cycles. However,...

UKCCSRC Call 1 Project: Multiphase flow modelling for risk assessment of dense phase CO2 pipelines containing impurities

This project will develop and experimentally validate a heterogeneous flow model for predicting the transient depressurisation and outflow following the puncture of dense phase CO2 pipelines...

DevelopmentPlanningDevelopmentSites_Phase1

Development Sites - Gateshead - 2015

DevelopmentPlanningDevelopmentSites_Phase2

Development Sites - Gateshead - 2015

ContaminatedLandInspectionAreas_Phase2

Contaminated Land - Gateshead - 2015

Marine Phase 1 Intertidal Habitat Survey

This is a dataset compiled of spatially-referenced survey data obtained from different intertidal communities (biotopes) in Wales. Maps include information on biotope location, species composition,...

Marine Phase 1 Intertidal Habitat Survey

This is a dataset compiled of spatially-referenced survey data obtained from different intertidal communities (biotopes) in Wales. Maps include information on biotope location, species composition,...

Camden Cycle Counters Phase 2 Map

Cycling in Camden is becoming ever more popular with the introduction of safe, convenient and protected routes. There are several cycle counters in Camden which provide counts of cyclists along...

UKCCSRC Call 2 project poster: Performance of Flow Meters with Dense Phase CO2 and CCS Recovery Streams, Cardiff Biannual, 10.09.14

This poster on the UKCCSRC Call 2 project, Performance of Flow Meters with Dense Phase CO2 and CCS Recovery Streams, was presented at the Cardiff Biannual, 10.09.14. Grant number: UKCCSRC-C2-201.

Synthetic Rayleigh wave phase delays and Vsv upper-mantle structure in the Pacific, a synthetic tomography

This repository contains data and inversion results for the SOLA finite-frequency tomography of the Pacific upper-mantle in a synthetic setup. It is related to the paper by Latallerie et al., 2025...

Barium concentration and stable isotope ratio measurements of the dissolved and adsorbed phases from laboratory batch experiments and Himalayan river samples from 2015-2016

This dataset contains barium concentration and stable isotope ratio measurements of the adsorbed and dissolved phases associated with batch laboratory adsorption-desorption reactions using common...