Search results

Filter by

Remove filters

1,875 results found

Southwick Masterplan

The purpose of this Masterplan is to ensure that the Local Planning Authority has sufficient information on which to make a decision on the key design principles of the Central Southwick...

Tree Preservation Orders areas

Area, Group or Woodland Tree Preservation Orders (TPOs) within Brecon Beacons National Park. Please note that the Brecon Beacons National Park Authority are in the final stages of reviewing all...

Tree Preservation Orders individual

Individual Tree Preservation Orders (TPOs) within Brecon Beacons National Park. Please note that the Brecon Beacons National Park Authority are in the final stages of reviewing all of the Tree...

Respond - Independent Case Examiner Complaints Database

Database containing details of clients who have made formal complaints about DWP Agencies and some private sector providers contracted by DWP to deliver services. Information recorded includes:...

Coal Development Low Risk Area

The Development Low Risk area is an area where our records do not indicate the presence of coal mining features at surface or shallow depth which may pose a risk to surface stability or public...

ICT contracts over £10,000, Department for Education (2010)

As part of the transparency agenda, the Department for Education is publishing all new information and communications technology (ICT) contracts over the value of £10,000 in 2010. When calling-off...

HSE Land Use Planning Data

HSE’s consultation zones have been developed to assist HSE in its role as a statutory consultee for planning applications around major hazard sites and major accident hazard pipelines. HSE use the...

Site Allocations

This dataset consists of the boundaries of all site allocations within the London Borough of Sutton which have been formally designated in the adopted Site Development Policies Development Plan...

Tree Preservation Orders - Argyll and Bute

Tree Preservation Orders (TPO) are served by the council to protect individual and groups of trees which are considered of sufficient merit to warrant formal protection either for their...

Cambridgeshire Housing Commitments 2017

Number of formal dwelling commitments at 31/03/2017, which includes those with planning permissions (not yet complete) or those allocated for development. Worksheet includes data by district,...

SSSI Impact Risk Zones (England)

The Impact Risk Zones for Sites of Special Scientific Interest (SSSI IRZs) are for local planning authorities (LPAs) to determine if a proposed development is likely to affect a terrestrial SSSI...

basildon_cs2012_padc6

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc10

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc1

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc12

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc11

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc13

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc2

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc3

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc4

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...