Important

We're planning improvements to this service. Help us learn what to change by completing a short survey.

Search results

Filter by

Remove filters

2,888 results found

2010, Gateway Gas Storage Ltd, Gateway Cavern Area, Site Survey, DECC Reference Number 2261

An oil and gas industry site survey for gas storage acquired between July and August 2010. The block number traversed was 110/3.

UK Miscellaneous: Report: A preliminary feasibility study for the underground disposal of carbon dioxide in UK 1991 (THE first UK CO2 storage publication)

This is THE first CO2 storage publication produced in the UK. The Association of the Coal Producers of the European Community are agreed that immediate action is required to reduce the build up of...

Analysis of in situ stress and fault reactivation - The Captain Sandstone storage aquifer - presentation presented at the '8th Trondheim Conference on CO2 Capture, Transport and Storage', Trondheim, Norway

The data consists of a presentation presented at the '8th Trondheim Conference on CO2 Capture, Transport and Storage', Trondheim, Norway, 16-18th June 2015. The presentation describes work...

NERC Project: QICS - Quantifying and monitoring environmental impacts of geological carbon storage (2010 - 2014)

QICS (Quantifying and monitoring environmental impacts of geological carbon storage) was a program funded by the Natural Environment Research Council (NERC), with support from the Scottish...

Performance Dashboard Applications for Section 36 consents, required for the construction, extension or operation of electricity generating stations

This dashboard shows information about how the Applications for Section 36 consents, required for the construction, extension or operation of electricity generating stations service is currently...

Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering and Design (FEED) - Chapter 06: Technical Design - Pipeline and Platform

During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...

UKCCSRC Call 1 project presentation: Fault seal controls on storage capacity, Cranfield Biannual, 22.04.15

The data consists of a presentation presented at the UKCCSRC biannual meeting in Cranfield, April 20th 2015. The presentation describes an overview of work carried-out on behalf of the 'Fault seal...

UKCCSRC Call 1 project poster: Fault seal controls on storage capacity, Cranfield Biannual, 21.04.15

This poster was presented at the Cranfield Biannual, 21.04.15. Grant number: UKCCSRC-C1-14. The data consists of a poster presented at the UKCCSRC biannual meeting in Cranfield, April 20th 2015....

Analysis of in situ stress and fault reactivation potential for a major candidate storage aquifer - extended abstract for the '8th Trondheim Conference on CO2 Capture, Transport and Storage', Trondheim, Norway

The data consists of an extended abstract submitted to the '8th Trondheim Conference on CO2 Capture, Transport and Storage', Trondheim, Norway, 16-18th June 2015. The abstract describes work...

QICS Paper: Detection and impacts of leakage from sub-seafloor deep geological carbon dioxide storage

Fossil fuel power generation and other industrial emissions of carbon dioxide are a threat to global climate1, yet many economies will remain reliant on these technologies for several decades....

Spatial mapping of surficial soil organic carbon storage and stocks across Great British saltmarshes

The geospatial dataset maps organic carbon (OC) storage (kg OC m-2) and OC stocks (tonnes OC) of surficial soils across 438 Great British saltmarshes. The OC density for the surficial soils (top 10...

UKCCSRC Call 2 Project: Multiscale characterisation of CO2 storage in the United Kingdom

This is a partnership between Imperial College London and the British Geological Survey in which we combine our expertise in pore scale digital rock physics (DRP), reservoir condition Special Core...

Carbon capture storage defining boundary of policy CCS1 in the East Inshore and East Offshore marine plans

This dataset has been created to define potential opportunity for carbon capture and storage (CCS1) as shown in the MMO East Inshore and East Offshore marine plans. The data has been derived from...

Statutory Safeguarding Zones - Bedenham, Fleetlands, Frater - Storage of munitions

The dataset shows the spatial extent of the statutory safeguarding zones represented on the corresponding hardcopy statutory safeguarding plans. Purpose: Safeguarding is a...

NI 066 - Looked after children cases which were reviewed within required timescales.

The indicator measures the percentage of children looked after cases which should have been reviewed during the year ending 31 March that were reviewed on time during the year Source: Statutory...

NI 089 - Reduction of number of schools judged as requiring special measures

The number of failing schools. A failing school is one judged on inspection by Ofsted to be providing inadequate education and lacking the capacity to improve, and therefore placed in special...

NI 066 - Looked after children cases which were reviewed within required timescales.

The indicator measures the percentage of children looked after cases which should have been reviewed during the year ending 31 March that were reviewed on time during the year

Feasibility study into Quantum Technology-based Gravity Sensing for Carbon Dioxide Capture and Storage

This study was carried out jointly by the University of Birmingham and the British Geological Survey. The report addresses the feasibility of using novel quantum-technology-based gravity sensors to...

EU Project: Weburn - IEA (International Energy Agency) Weyburn CO2 monitoring and storage project

The IEA (International Energy Agency) Weyburn Carbon Dioxide (CO2) Monitoring and Storage Project has analysed the effects of a miscible CO2 flood into a carbonate reservoir rock at an onshore...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 08: Consents and Permitting Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...