Search results

Filter by

Remove filters

634 results found

Social Integration Headline Measures

The Mayor is committed to measuring social integration in London. Providing evidence-based analysis of the state of social integration will allow him to shine a light on the whole...

Social Integration Measurement Toolkit

At the end of 2019 the Greater London Authority (GLA) commissioned PRD to develop a standardised social integration measurement toolkit, for use by the GLA and other organisations when monitoring...

Hackney Article 4 Directions - Flexible Town Centre Use

Article 4 Direction (A4D) is part of planning legislation that allows the Council to remove permitted development rights including changes of use from an area or a particular property. This dataset...

Social Integration by Borough

Percent who agree that their local area is a place where people from different backgrounds get on well together. This question is asked in the Public Attitudes Survey (PAS). The PAS is run by the...

Integrated Household Survey

The Integrated Household Survey (IHS) is the largest social survey ever produced by the Office for National Statistics (ONS). The survey is comprised of a core suite of questions from current ONS...

CSGN - Integrated Habitat Networks

The approach employs a detailed desk study using digital data within a geographic information system (GIS) to identify Integrates Habitat Networks (IHNs). The spatial position and extent of...

UKCCSRC Call 1 project blog: Flexible CCS Network Development, Update, 06.03.14

This is a blog (Update, 06.03.14) on the UKCCSRC Call 1 project, Flexible CCS Network Development. Grant number: UKCCSRC-C1-40.

Smart and Integrated Ticketing Report

Report to investigate the awareness of and use made of multi-journey tickets on bus and train journeys. Source agency: Regional Development (Northern Ireland) Designation: Official Statistics not...

Bemisia tabaci IPM (Integrated Pest Management)

Developing an integrated pest management approach for the containment and eradication of Bemisia tabaci (Gennadius)

Integrated Performance Measures Monitoring

Monitors how PCTs perform against measures in the following areas: CHD-Diabetic retinopathy; CHD-NHS Health Checks; Older people-Delayed Discharge; Health Improvement-Maternity; Health...

Integrated Performance Measures Monitoring

Monitors how PCTs perform against measures in the following areas: CHD-Diabetic retinopathy; CHD-NHS Health Checks; Older people-Delayed Discharge; Health Improvement-Maternity; Health...

Police integrity and corruption inspection data

This data was collected to support the HMIC report "Police integrity and corruption force reports" published on 27 November 2014.

UKCCSRC Call 1 project blog: Flexible CCS Network Development, Workshop1, 30.04.14

This is a blog (Workshop1, 30.04.14) on the UKCCSRC Call 1 project, Flexible CCS Network Development. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Cranfield Biannual, 22.04.15

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 22.04.15. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project poster: Flexible CCS Network Development, Cambridge Biannual, 02.04.14

This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cambridge Biannual, 02.04.14. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project poster: Flexible CCS Network Development, Cranfield Biannual, 21.04.15

This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 21.04.15. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Workshop1, 30.04.14

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Workshop1, 30.04.14. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Workshop1ES, 30.04.14

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Workshop1ES, 30.04.14. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 Project: FleCCSnet - Flexible CCS Network Development

This project will produce and disseminate the first design and operating guidelines for the flexible operation of CCS pipeline networks. The research will explore how CCS pipeline networks can...

Integrated Site Assessment Species Records

Integrated Site Assessments are carried out by Natural England staff to assess the condition of notified features on Sites of Special Scientific Interest, and Indicators of Success on Higher Level...