Search directory

Filter by

1,050 results found

Number of initiatives in borough's digital strategies for collaboration (data sharing/common standards)

A digital strategy is a plan for focusing and scaling up the benefits to the council, the place, and/or its customers (residents and businesses) of data assets and technology-focused projects and...

Municipal Recycling & Waste Strategy - Assumptions: Economic and Financial Outlook

This section outlines the assumptions we have used as a basis for Barnet Council’s Municipal Recycling & Waste Strategy and the various evidence collated that supports them EO1 - The...

City and Town Centre Shopping Area Core Strategy 2014 Policy CP12

Core Strategy adopted 2014 (Policy CP12) Defines the hierarchy of shopping centres as the principal locations for shopping and community facilities as well as offices, local entertainment, art and...

Long-Term Mobility of Gravel in Rivers: Remapping the Allt Dubhaig Tracer Pebbles

PROJECT DETAILS ONLY - NO DATA. The long term mobility of different sized pebbles under different hydraulic conditions will be investigated by re-mapping 1220 magnetically tagged pebbles which have...

Bath Enterprise Area Core Strategy 2014 Policies B1 B3 B5

Core Strategy adopted 2014 Policies B1 B3 B5. Defines the boundary of a key area of change within Bath comprising a collection of development opportunity sites and buildings along the river corridor.

Tunbridge Wells Open Data - Transparency - Final Medium Term Financial Strategy 2017-18 to 2021-22

Tunbridge Wells Open Data - Transparency - Final Medium Term  Financial Strategy 2017-18 to 2021-22

North of Tyne Local Nature Recovery Strategy - Strategic Recovery Areas

For the Local Nature Recovery Strategy (LNRS) which was adopted in March 2026. Not part of the statutory mapping (refer to the LNRS document for more explanation). This is where there are large...

Hip fracture: proportion of patients recovering to their previous levels of mobility/walking ability at 120 days (CCGOIS 3.10.ii)

The proportion of patients aged 60 and over with a hip fracture recovering to their previous levels of mobility at 120 days after admission to hospital, expressed as a percentage with 95%...

Hip fracture: proportion of patients recovering to their previous levels of mobility/walking ability at 30 days (CCGOIS 3.10.i)

The proportion of patients aged 60 and over with a hip fracture recovering to their previous levels of mobility at 30 days after admission to hospital, expressed as a percentage with 95% confidence...

Northern Ireland Road Safety Strategy to 2020 – Monitoring of Targets and Key Performance Indicators

This is a annual update monitoring the targets and key performance indicators set out in the Northern Ireland Road Safety Strategy to 2020. Source agency: Environment (Northern...

Satellite-derived geomorphic river mobility for ten catchments in the Philippines, 1988-2019

This data set contains satellite-derived information on geomorphic river mobility for ten catchments in the Philippines. We applied the locational probability approach to map the proportion of time...

UK Marine Strategy Descriptor 11 ship noise assessment data for 2018 to 2022

Annual median broadband (63 Hz - 4 kHz) sound level data for UK waters for the years 2018-2022 inclusive. Data format is ASCII. These maps underpin the UK Marine Strategy 2024 assessment for...

Ofcom Connected Nations (previously called Infrastructure Report) - UK internet speeds and coverage: broadband, wifi and mobile

Ofcom's annual reports on the UK’s fixed broadband coverage, mobile and wifi network coverage, digital television, digital radio and internet infrastructure. Please see our terms of use for our...

North of Tyne Local Nature Recovery Strategy - Stage 1

For the Local Nature Recovery Strategy (LNRS) which was adopted in March 2026. This data forms the Stage 1 mapping which identifies "Areas of Particular Importance for Biodiversity" or...

Barrow Port Area Action Plan Policy BPSV2 - Spatial Strategy for Port Area Action Plan

Areas affected by policy BPSV2 Spatial Strategy for Port Area Action Plan from the Barrow Port Area Action Plan. Areas are recorded as a polygon. Upon accessing this Licensed Data you will be...

Technology Strategy Board Transparency Data

Required Transparency Data Salary Bands

Strategic Site Allocations Core Strategy 2014 Policies B3A KE3A KE4A RA5

Core Strategy adopted 2014 Policies B3A KE3A KE4A RA5. Defines the boundary of large strategic sites allocated principally for residential development on the edge of Bath, Keynsham and Whitchurch.

Flood risk assessment of the Luanhe river basin under different development strategies and climate scenarios

The dataset describes the data needed for and results produced by the flood risk assessment framework under different development strategies of Luanhe river basin under a changing climate. The...

Coastal Biodiversity and Ecosystem Service Sustainability (CBESS) larger mobile macrofaunal abundance, biomass and species richness from fyke netting in mudflat habitats

The dataset details larger mobile fish and macrofaunal abundance across six intertidal sites in the winter and summer of 2013, sampled using fyke nets. The data provide a quantitative measure of...

North of Tyne Local Nature Recovery Strategy - Opportunities in the Wider Countryside

For the Local Nature Recovery Strategy (LNRS) which was adopted in March 2026. This layer represents opportunities for nature recovery within the wider countryside, outside of the measures in Stage...