Search directory

Filter by

5,058 results found

Data and codes to demonstrate measurement of shear-wave attenuation anisotropy beneath the Ethiopian Rift

Shear-wave attenuation anisotropy can provide constraints on mantle melt, such as that present beneath the Ethiopian rift. This package contains codes implementing a new methodology to measure such...

Legacy BGS geothermal models: isopach map for the Sherwood Sandstone Group in the Permo-Triassic Cheshire, Worcester, Wessex and East Yorkshire-Lincolnshire basins

This dataset represents the modelled thickness in metres of the Sherwood Sandstone Group (SSG) in the main Permo-Triassic Cheshire, Wessex, Worcester and East Yorkshire-Lincolnshire basins,...

Legacy BGS geothermal models: depth to the base Sherwood Sandstone Group in the Permo-Triassic Cheshire and Worcester basins

This vector contour dataset represents the modelled depth in meters to the base Sherwood Sandstone Group (SSG) in the Permo-Triassic Cheshire and Worcester basins, considered for their hot...

Climate History Controls Future Landslide Hazard (NERC grant NE/J009067/1)

Supplementary material and link to published paper - Colluvium Supply in Humid Regions limits the Frequency of storm-triggered Landslides. DOI:10.1038/srep34438 Colluvium depth observations...

Train Station Usage

National rail statistics Estimates of station usage figures are derived from ticket sales data recorded in rail industry systems.Eurostar and Heathrow Express are not included in rail industry...

London Fire Brigade - Incidents Attended - Summary Report

London Fire Brigade is the busiest fire and rescue service in the country and one of the largest firefighting and rescue organisations in the world.This table summarises the details of every...

Jobs by occupation and highest qualification

Estimates of number of jobs by industry sector, occupation and highest qualification of the jobholder. The data is taken from the Annual Population Survey and derived by the Office of National...

Controls on Matrix and Fracture Flow from Geochemical Analysis of Produced Oil

PROJECT DETAILS ONLY - NO DATA. Predicting oil production from chalk reservoirs relies on quantifying contributions from fracture and matrix porosity, which change during compaction. Cl isotopes in...

Field and analytical data from Tipperary CO2 seep, Daylesford, Australia (2017)

This dataset contains: 1. An excel spreadsheet of field data from Tipperary pool, including CO2 bubble locations, raw and derived flux data, and field description. March 2017 field campaign. 2....

Road Noise - Octave Band Data - England Round 4

Octave band data indicating the level of noise according to the strategic noise mapping of road sources across England. PLEASE NOTE ALL DATA IS UNWEIGHTED The day-evening-night level (Lden) is a...

NI Air Quality

Air pollution results from the introduction of a range of substances into the atmosphere from a wide variety of sources. It can cause both short term and long term effects on health, but also on...

Local Development Plan: Development Management Zones (Settlement Zone) - Argyll and Bute

Development Management Zones designated in the Argyll and Bute adopted Local Development Plan 2015. For the purposes of this plan the term settlement applies to the following development management...

basildon_cs2012_padc6

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

Article 4 Directions

Article 4 Direction (ART4). Serves to restrict permitted development rights, which means that a lot of the things people do to their land or houses without planning permission and often take for...

basildon_cs2012_padc10

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc1

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc12

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc11

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc13

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc2

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...