Filter by
1,108
results found
- Published by:
- Greater London Authority
- Last updated:
- 24 June 2026
Delivering productivity and efficiency improvements is a key consideration for the London Fire Commissioner’s (LFC) strategic planning as set out in the Community Risk Management Plan (CRMP). It is...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 25 June 2026
UKCCSRC Flexible Funding 2020. The experimental data was collected on a 1-inch bore gas-liquid two-phase CO2 flow rig in real time. The first column of the table is the time stamp. The second to...
- Published by:
- Department for Transport
- Last updated:
- 12 December 2013
Details of instructors trained to deliver training to the National Standard for cycle training.
- Published by:
- North Norfolk District Council
- Last updated:
- 10 February 2016
This dataset contains the premises from which North Norfolk District Council delivers leisure related services
- Published by:
- Department for Work and Pensions
- Last updated:
- 19 December 2013
This report sets out the Department's aims and objectives to deliver its carbon reduction commitment.
- Published by:
- Cabinet Office
- Last updated:
- 01 October 2013
Project plans that are used to help deliver the work of the Procurement Policy & Capability Team
- Published by:
- National College for Teaching and Leadership
- Last updated:
- 19 September 2013
Selected materials from the 2 week ITT primary music modules developed and delivered by 21 ITT providers
- Published by:
- City of York Council
- Last updated:
- 08 July 2025
This document contains some key facts about York and the context in which we deliver our services.
- Published by:
- Environmental Information Data Centre
- Last updated:
- 14 May 2026
This dataset contains measurements of hydraulic head and saturated hydraulic conductivity together with porewater chemistry from banks and riverbed sediments in six river reaches of contrasting...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 25 June 2026
This British Geological Survey (BGS) marine geophysical and sampling survey took place in June 2004 in the Clyde estuary from Greenock to the Erskine Bridge aboard the Griffon Hovercraft. The...
- Published by:
- Greater London Authority
- Last updated:
- 24 June 2026
OverviewAn updated spatial data set for existing green roofs has been produced for London's Central Activities Zone (CAZ) using 2015 aerial imagery. The CAZ makes up around two per cent of London's...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 25 June 2026
TEX86 sea surface temperature compilation for the Eocene epoch (56 to 34 million years ago). Also included are other GDGT-based indices which are used to flag potentially problematic SST estimates....
- Published by:
- Scottish Government SpatialData.gov.scot
- Last updated:
- 19 June 2024
The aim of this FGS option is to support the targeted control of grey squirrels (Sciurus carolinensis) in areas where they are a threat to red squirrel (Sciurus vulgaris) populations.
This support...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 25 June 2026
Element maps from 5x 10 cm sections generated using the Zeiss Sigma HD Field Emission Gun Analytical SEM at Cardiff University. Maps come from sections within the early Miocene pelagic interval...
- Published by:
- Greater London Authority
- Last updated:
- 24 June 2026
Information on projects funded by the Mayor of London's Young Londoners Fund. This spreadsheet details the value of grants, types of activities delivered, the age range of people to be supported...
- Published by:
- City of London
- Last updated:
- 14 April 2022
This layer shows the point locations where work is going to happen to deliver the CSS grant for Epping Forest.
- Published by:
- City of London
- Last updated:
- 14 April 2022
This layer shows the area locations where work is going to happen to deliver the CSS grant for Epping Forest.
- Published by:
- Office for National Statistics
- Last updated:
- 26 April 2014
The National Bereavement Survey (VOICES) is conducted by the Office for National Statistics on behalf of the Department of Health. The aims of the survey are to assess the quality of care delivered...
- Published by:
- Greater London Authority
- Last updated:
- 24 June 2026
The Business Plan 2013/14 established for the first time a suite of GLA Key Performance Indicators (KPI) closely linked to Mayoral priorities.These statistics show KPI performance, together with...
- Published by:
- Nottingham City Council
- Last updated:
- 29 March 2023
The area of Highway Planning Lines safeguarded for road improvements within Nottingham City, indicating areas of land required to deliver transport schemes.