Search directory

Filter by

968 results found

LocalWildlifeSites_Phase1

Local Wildlife Sites- Gateshead - 2015

GreenbeltWithinGateshead_Phase2

Greenbelt - Gateshead - 2015

PrimarySchoolCatchments_Phase2

Primary School Catchments - Gateshead - 2015

TreePreservationOrders_Phase2

Tree Preservation Orders - Gateshead - 2015

LocalWildlifeSites_Phase2

Local Wildlife Sites- Gateshead - 2015

NNPA Phase 1 Habitat Survey

Complete coverage of habitat types in Northumberland National Park, originally undertaken in 1992 then digitised later. Subsequently updated with patches of more up-to-date habitat information...

SchoolMainEntrances_Phase2

School Main Entrances - Gateshead - 2015

UrbanCoreBoundary_Phase2

Urban Core - Gateshead - 2015

Camden Cycle Counters Phase 2

Cycling in Camden is becoming ever more popular with the introduction of safe, convenient and protected routes. There are several cycle counters in Camden which provide counts of cyclists along...

Two-phase modeling of water partitioning between liquid iron and silicate melt (NERC Grant NE/S01134X/1)

The two-phase modeling of water between liquid iron and silicate melt at 50 and 135 gigapascals (corresponding to 3500 and 4200 kelvin) was performed by using ab initio molecular dynamics...

Photos, XRF elements, total N and C, and isotopic data (d18O, d13C) from Deep Sea Drilling Project Site 225 cores, central Red Sea

Photographs, 18O/16O isotopic ratios, XRF-derived elemental and N, C concentration data are provided for sediment cores from Deep Sea Drilling Project Site 225, central Red Sea. This site was...

Temperature data from a public dive log application, acquired from recreational divers’ dive computers in the northern Red Sea (2000-2017)

A collection of raw dive computer data (latitude, longitude, date, time, minimum temperature, surface temperature and maximum depth) logged by unknown recreational divers and uploaded to a publicly...

UKCCSRC Call 1 project poster: Multi-Phase Flow Modelling for Hazardous Assessment, CSLF Call project poster reception, London, 27.06.16

This poster on the UKCCSRC Call 1 project Multiphase flow modelling for hazard assessment of dense phase CO2 pipelines containing impurities was presented at the CSLF Call project poster reception,...

Characterization results of the synthesis of iron sulfide phases (NERC grant NE/J008745/1)

Data produced from NERC Grant NE/J008745/1. Grant Abstract: Iron sulfides are widespread in the environment, where they regulate and control the global geochemical iron and sulfur cycles. However,...

UKCCSRC Call 1 Project: Multiphase flow modelling for risk assessment of dense phase CO2 pipelines containing impurities

This project will develop and experimentally validate a heterogeneous flow model for predicting the transient depressurisation and outflow following the puncture of dense phase CO2 pipelines...

CO2 Flow Metering

UKCCSRC Flexible Funding 2020. The experimental data was collected on a 1-inch bore gas-liquid two-phase CO2 flow rig in real time. The first column of the table is the time stamp. The second to...

DevelopmentPlanningDevelopmentSites_Phase1

Development Sites - Gateshead - 2015

DevelopmentPlanningDevelopmentSites_Phase2

Development Sites - Gateshead - 2015

ContaminatedLandInspectionAreas_Phase2

Contaminated Land - Gateshead - 2015

Marine Phase 1 Intertidal Habitat Survey

This is a dataset compiled of spatially-referenced survey data obtained from different intertidal communities (biotopes) in Wales. Maps include information on biotope location, species composition,...