Search directory

Filter by

892 results found

Water Body Measures Wear

Water body measures are the actions which will be taken on the ground to help achieve water body objectives. They are brought about by a range of legal, policy or financial mechanisms and involve...

Water Body RNAGS Wear

Water body reasons for not achieving good status (RNAGS) identify the pressures that are impacting the status classification of water bodies. Reasons for deterioration (RFDs) identify the...

Water Body Status Classification Wear

Water body status classification data indicates the quality or status of water bodies across a range of different parameters known as quality elements. This dataset includes the classification...

Water Body Status Objectives Wear

Water body status objectives describe the long term aim for specific parts of the water environment. This dataset includes the latest objectives of all water bodies in the Wear catchment. Water...

Real-time train running data

Real-time train running data

NI 178a - Bus services running on time - Proportion running on time

Proportion running on time and excess waiting times for bus services. Punctuality is generally measured according to the guidance provided by the Department for Transport on the CLIP website.

Import demand: long run income elasticities

Results presented in BIS research paper no. 144 Long run income elasticities of import demand.

Geohazard Assessment of Running Sand Deposits

**No longer exists - now part of GeoSure**An assessment of the potential for a geological deposit to show running sand behaviour under the action of flowing water. A characteristic usually of...

GeoSure Running Sand Deposits

The GeoSure data sets and reports from the British Geological Survey provide information about potential ground movement or subsidence in a helpful and user-friendly format. The reports can help...

NI 178 - Bus services running on time

Proportion running on time and excess waiting times for bus services. Punctuality is generally measured according to the guidance provided by the Department for Transport on the CLIP website.

Individual Electoral Registration: Confirmation Dry Run Data

Data details the results of the confirmation dry run (CDR), a test of the confirmation process which will be the first step in transition to Individual Electoral Registration. The full evaluation...

NI 178 - Bus services running on time

Proportion running on time and excess waiting times for bus services. Punctuality is generally measured according to the guidance provided by the Department for Transport on the CLIP...

Running sand dataset (5km Hex-Grid) version 8

The 5km Hex GS Running Sand dataset shows a generalised view of the GeoSure Running Sand v8 dataset to a hexagonal grid resolution of 64.95km coverage area (side length of 5km). This dataset...

Running sand dataset (5km Hex-Grid) version 7

The 5km Hex GS Running Sand dataset shows a generalised view of the GeoSure Running Sand v7 dataset to a hexagonal grid resolution of 64.95km coverage area (side length of 5km). This dataset...

GeoSure running sand deposits version 8

This dataset provides an assessment of the potential for a geological deposit to show running sand behaviour under the action of flowing water, a characteristic usually of saturated sand and silt...

Images from Archaeological Building Recording Work at Hendon Foreshore Barrier, Port of Sunderland, Tyne and Wear, January 2023

This collection comprises images from an examination and photographic survey of the Hendon Foreshore Barrier, Port of Sunderland, Tyne and Wear. This work was undertaken by Archaeological Services...

Images from Archaeological Building Recording Work at Hendon Foreshore Barrier, Port of Sunderland, Tyne and Wear, January 2023

This collection comprises images from an examination and photographic survey of the Hendon Foreshore Barrier, Port of Sunderland, Tyne and Wear. This work was undertaken by Archaeological Services...

% of Talkabout panel satisfied with the way the council runs things

% of Talkabout panel satisfied with the way the council runs things. This is a measure of the Talkabout panel members who are satisfied with the way the council runs things. The question is asked...

% of Talkabout panel dissatisfied with the way the council runs things

% of Talkabout panel dissatisfied with the way the council runs things

NI 178b - Bus services running on time - Average waiting time

Proportion running on time and excess waiting times for bus services. Punctuality is generally measured according to the guidance provided by the Department for Transport on the CLIP website.