Filter by
685
results found
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 25 June 2026
TEX86 sea surface temperature compilation for the Eocene epoch (56 to 34 million years ago). Also included are other GDGT-based indices which are used to flag potentially problematic SST estimates....
- Published by:
- Scottish Government SpatialData.gov.scot
- Last updated:
- 19 June 2024
The aim of this FGS option is to support the targeted control of grey squirrels (Sciurus carolinensis) in areas where they are a threat to red squirrel (Sciurus vulgaris) populations.
This support...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 25 June 2026
Element maps from 5x 10 cm sections generated using the Zeiss Sigma HD Field Emission Gun Analytical SEM at Cardiff University. Maps come from sections within the early Miocene pelagic interval...
- Published by:
- Department for Education
- Last updated:
- 09 February 2017
Data to support BIS research paper no. 73. Report of research commissioned by BIS to inform impact and equality assessments on the introduction of loans to fund Further Education (FE) courses. Also...
- Published by:
- University of Edinburgh
- Last updated:
- 11 February 2016
This contour dataset complements 13 other datasets as part of a study that compared ancient settlement patterns with modern environmental conditions in the Jazira region of Syria.
This study...
- Published by:
- Environmental Information Data Centre
- Last updated:
- 14 May 2026
This dataset comprises multiple baseline and future ensembles of hydrological model estimates of monthly mean and annual maximum river flows (m3s-1) on a 0. 0.008333° × 0. 0.008333° grid...
- Published by:
- Environmental Information Data Centre
- Last updated:
- 14 May 2026
This dataset contains first egg dates for great tits (Parus major) and blue tits (Cyanistes caeruleus) from Monks Wood, Brampton Wood and Wennington Wood in Cambridgeshire, England, over a 23 year...
- Published by:
- Environmental Information Data Centre
- Last updated:
- 14 May 2026
[THIS DATASET HAS BEEN WITHDRAWN]. This dataset contains first egg dates for great tits (Parus major) and blue tits (Cyanistes caeruleus) from Monks Wood, Brampton Wood and Wennington Wood in...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 25 June 2026
PROJECT DETAILS ONLY - NO DATA. At sub-continuum scales, pore network geometry strongly influences flow and solute transport. Fractures spaced ~0.1 to ~10m impart continuum scales to fractured...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...