Filter by
390
results found
- Published by:
- North Lincolnshire Council
- Last updated:
- 19 December 2019
North Lincolnshire Council Air monitoring - Diffusion Tubes represented as points.
- Published by:
- HM Revenue and Customs
- Last updated:
- 12 December 2013
Survey of HMRC staff working patterns and attitudes to mobile/flexible working. Updated: one-off survey. Data coverage: 2013/14
- Published by:
- Scottish Government SpatialData.gov.scot
- Last updated:
- 23 July 2020
Tubes measure nitrogen dioxide levels at their location. Used to identify any pockets of air pollution and provide indication of exposure levels.
- Published by:
- Natural Resources Wales
- Last updated:
- 24 October 2025
This study involved the assessment of red squirrel occupancy and habitat preferences within Clocaenog Forest. A stratified random sampling strategy was employed, along with a ‘targeted’ survey to...
- Published by:
- City of York Council
- Last updated:
- 26 August 2025
Red rated Large Projects - CYC.
RAG (red-amber-green) project rating is used in project management for indicating the progress of projects. This measure shows the number of council's large...
- Published by:
- London Borough of Hackney
- Last updated:
- 21 March 2017
Article 4 Direction Flexible Town Centre in Hackney - An Article 4 Direction (A4D) is part of planning legislation that allows the Council to remove permitted developments rights including changes...
- Published by:
- Forestry Commission
- Last updated:
- 28 July 2025
Spatial data supporting the England Woodland Creation Offer (EWCO) additional contribution targeting for Nature Recovery. This layer is identical to that titled ‘CS WCM Biodiversity - Priority...
- Published by:
- Department for Business, Energy and Industrial Strategy
- Last updated:
- 12 August 2013
Data from the impact assessment for proposals to make employment practices in the UK more flexible and family-friendly. The data provides ethnic breakdown of male employees; male employees with a...
- Published by:
- OpenDataNI
- Last updated:
- 03 June 2016
Small test site for combined bathymetric and topographic LiDAR in Red Bay, surveyed January 2006. Data were tidally corrected using UK Hydrographic Office "Total Tide" software and cleaned in Caris...
- Published by:
- Department for Business, Energy and Industrial Strategy
- Last updated:
- 10 May 2014
Data supporting the impact assessment for proposals to extend the right to request flexible working to all employees. These proposals aim to facilitate the employee-employer information exchange...
- Published by:
- Department for Business, Energy and Industrial Strategy
- Last updated:
- 12 August 2013
Data supporting the impact assessment for proposals on extending flexible parental leave in the closed consultation on modern workplaces (URN 11/699). The new system of flexible parental leave aims...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
Dataset comprises the results of a study into the engineering geological characteristics of tropical red clay soils, funded by the Overseas Development Administration. The geotechnical properties...
- Published by:
- London Borough of Hackney
- Last updated:
- 07 January 2020
Article 4 Direction (A4D) is part of planning legislation that allows the Council to remove permitted development rights including changes of use from an area or a particular property. This dataset...
- Published by:
- Marine Environmental Data & Information Network
- Last updated:
- 28 May 2026
The survey was carried out to assess the condition of the Red Bay SAC subtidal sandbank feature and maerl sub-feature. It used UWTV and sediment grab sampling, MBES mapping was also carried...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
This is a blog (Update, 06.03.14) on the UKCCSRC Call 1 project, Flexible CCS Network Development. Grant number: UKCCSRC-C1-40.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
This is a blog (Workshop1, 30.04.14) on the UKCCSRC Call 1 project, Flexible CCS Network Development. Grant number: UKCCSRC-C1-40.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cambridge Biannual, 02.04.14. Grant number: UKCCSRC-C1-40.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 21.04.15. Grant number: UKCCSRC-C1-40.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 22.04.15. Grant number: UKCCSRC-C1-40.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 18 June 2026
This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Workshop1, 30.04.14. Grant number: UKCCSRC-C1-40.