Search directory

Filter by

543 results found

LiDAR for Scotland Phase 6 - LAS

The Scottish Public Sector LiDAR (Phase 6) was initially captured by Fugro for Scottish Power Energy Network (SPEN) from 2021 to 2022 to monitor their overhead power cable network under their...

Sepnd over £25,000 in NHS Dorset

A monthly updated list of all financial transactions spending over £25,000 made by NHS Dorset, as part of the Government's commitment to transparency in expenditure. Please follow the link to the...

HMRC Customer Experience Scores

Data on HMRC's Customer Experience Scores, measuring the customer experience that the tax system is simple and even-handed. See the "full description" link below to go to the page on the HMRC...

North Norfolk District Council Compulsory Purchase Orders

Areas of land that have been acquired using compulsory purchase powers within North Norfolk

Alcohol and late night refreshment licensing

Draws together statistics on the following licensing authority powers under the Licensing Act 2003

Stop and Search Statistics 2017/18

Stop and Search is an operational tool used to prevent, detect and investigate crime as well as to bring offenders to justice. Police officers have a legal power to stop and search members of the...

Stop and Search Statistics 2016/17

Stop and Search is an operational tool used to prevent, detect and investigate crime as well as to bring offenders to justice. Police officers have a legal power to stop and search members of the...

Stop and Search Statistics 2018/19

Stop and Search is an operational tool used to prevent, detect and investigate crime as well as to bring offenders to justice. Police officers have a legal power to stop and search members of the...

Stop and Search Statistics 2017/18 - 2024/25

Stop and Search is an operational tool used to prevent, detect and investigate crime as well as to bring offenders to justice. Police officers have a legal power to stop and search members of the...

2010 Defra MB0106 Tidal Range SDC

Tidal range locations recommended by SDC in Tidal Power in the UK Research Report 1, October 2007.

2010 Defra MB0106 Tidal Range SDC

Tidal range locations recommended by SDC in Tidal Power in the UK Research Report 1, October 2007.

LiDAR for Scotland Phase 4 - DSM

The Scottish Public Sector LiDAR (Phase 4) was initially captured by Fugro for Scottish Power Energy Network (SPEN) from 2017 to 2019 to monitor their overhead power cable network under their...

Northern Powergrid open datasets

Northern Power Grid covers north east England, Yorkshire and north Lincolnshire. Their website includes interactive maps and open data.

LiDAR for Scotland Phase 4 - LAS

The Scottish Public Sector LiDAR (Phase 4) was initially captured by Fugro for Scottish Power Energy Network (SPEN) from 2017 to 2019 to monitor their overhead power cable network under their...

Scanned copies of annotated Scottish 1 inch scale maps with fossil locations and geology

[This metadata record has been superseded, see http://data.bgs.ac.uk/id/dataHolding/13606458] Scanned copies of Scottish 1 inch scale maps which are annotated with fossil locations and geology....

British Geological Survey (BGS) Sampling Survey 1971/12: Beach/Tidal zone: Moray Firth (01/Jan/1971 to 01/Jan/1971)

This British Geological Survey (BGS) marine sampling survey took place in 1971 along the Moray Firth coastline. The purpose was to collect beach samples as part of an offshore regional geological...

British Geological Survey (BGS) Sampling Survey 1980/HV/1: Solway Firth (11/Jul/1980 to 19/Jul/1980)

This Institute of Geological Sciences now British Geological Survey (BGS) marine geochemical and sampling survey took place in July 1980 in the Solway Firth aboard a hovercraft AV Tiger. Sea-bed...

LiDAR for Scotland Phase 4 - DTM

The Scottish Public Sector LiDAR (Phase 4) was initially captured by Fugro for Scottish Power Energy Network (SPEN) from 2017 to 2019 to monitor their overhead power cable network under their...

Proposed streetworks

This dataset contains details of our proposed street and roadwork permit applications taking place on the highway within UK Power Networks' footprint.

UKCCSRC Call 1 project paper: Enhanced operating flexibility and optimised off-design operation of coal plants with post-combustion capture

The inherent nature of electricity necessitates a permanent balance between generation and demand in electricity systems. This has obvious implications for the operation of CCS power plants in...