Filter by
1,407
results found
- Published by:
- Cranfield University
- Last updated:
- 10 February 2016
NSI topsoil2 contains a comprehensive record of many of the important elemental abundances in the soils of the UK. These analyses were performed on samples taken during a resampling exercise during...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 23 July 2026
Geochemical data for the Huainan Basin include Fe speciation data; P speciation data; elemental Al, Fe, P, Mn, Sr data, total organic carbon; C isotope ratios of organic C and carbonates....
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 23 July 2026
This map layer represents an assessment of the vulnerability of groundwater within the uppermost aquifer. This classification was initially undertaken to support groundwater assessments undertaken...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 15 March 2024
This report is a contribution to the Strategic Environmental Assessment (SEA6) conducted by the Department of Trade and Industry (now Department of Energy and Climate Change). Cephalopods are...
- Published by:
- Environmental Information Data Centre
- Last updated:
- 02 July 2026
Surface water quality data for the Conwy catchment, North Wales are presented. The data cover stream and estuary survey locations sampled manually from 2007 to 2011 at varying intervals between...
- Published by:
- Environmental Information Data Centre
- Last updated:
- 02 July 2026
This dataset comprises multiple baseline and future ensembles of hydrological model estimates of monthly mean and annual maximum river flows (m3s-1) on a 0. 0.008333° × 0. 0.008333° grid...
- Published by:
- Environmental Information Data Centre
- Last updated:
- 02 July 2026
[THIS DATASET HAS BEEN WITHDRAWN]. This dataset contains first egg dates for great tits (Parus major) and blue tits (Cyanistes caeruleus) from Monks Wood, Brampton Wood and Wennington Wood in...
- Published by:
- Environmental Information Data Centre
- Last updated:
- 02 July 2026
This dataset contains first egg dates for great tits (Parus major) and blue tits (Cyanistes caeruleus) from Monks Wood, Brampton Wood and Wennington Wood in Cambridgeshire, England, over a 23 year...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 23 July 2026
PROJECT DETAILS ONLY - NO DATA. At sub-continuum scales, pore network geometry strongly influences flow and solute transport. Fractures spaced ~0.1 to ~10m impart continuum scales to fractured...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...