Search results

Filter by

Remove filters

752 results found

Separated Service

System that enables the users to identify which service personnel have undertaken large quantities of Separated Service. This is to aid the Army planning in identification of potential people to...

Traffic Separation Schemes

Traffic Separation Schemes

Separated Service Planning Tool Centre

Details of Royal Navy and Royal Marines days away from base port to ensure separated service levels not exceeded; matches competencies to positions and highlights course needs

Traffic Separation Schemes and Deep Water Routes Web Feature Service

This Web Feature Service publishes polygons depicting the Traffic Separation Schemes and Deep Water Routes around the UK and in the southern North Sea. The coordinates of the Traffic Separation...

Members Travel (paid for by CYC – separate to allowances)

Members Travel (paid for by CYC – separate to allowances) – Individual journeys from April 2013 onwards These allowances and expenses are paid direct to Members on a monthly basis. Details of...

Longer Separation Allowance Report

Details for reconciliation of accounts

iHydrogeology shale and aquifer surfaces (vertical separation maps and data)

These maps provide an overview, at the national scale, of the spatial relationships between principal aquifers and some of the major shale and clay units in England and Wales. The data comprises a...

Source apportionment of annual nutrient and sediment loads to rivers in England and Wales, from the SEPARATE framework

Estimates of discharged loads of nitrogen, phosphorous and fine-grained sediments to rivers in England and Wales from multiple sector sources, reported at Water Framework Directive catchment scale,...

Maritime and Coastguard Agency (MCA) Bathymetric Survey HI1442, Dover Strait TSS Separation (Central), (17/11/2013 to 30/03/2014)

Samples and associated geological data are held at the British Geological Survey for Maritime Coastguard Agency (MCA), Civil Hydrography Programme (CHP), Bathymetric Survey HI1442; Dover Strait TSS...

Maritime and Coastguard Agency (MCA) Bathymetric Survey HI1443, Dover Strait TSS Separation (West), (06/03/2013 to 17/03/2013)

Samples and associated geological data are held at the British Geological Survey for Maritime Coastguard Agency (MCA), Civil Hydrography Programme (CHP), Bathymetric Survey HI1443; Dover Strait TSS...

UKCCSRC Call 2 project poster: Novel Materials and Reforming Processing Route for the Production of Ready-Separated CO2/N2/H2, Cardiff Biannual, 10.09.14

This poster on the UKCCSRC Call 2 project, Novel Materials and Reforming Processing Route for the Production of Ready-Separated CO2/N2/H2 from Natural Gas Feedstocks, was presented at the Cardiff...

UKCCSRC Call 2 Project: Novel Materials and Reforming Processing Route for the Production of Ready-Separated CO2/N2/H2 from Natural Gas Feedstocks

The world's population is predicted to grow from the current 7 billions to a plateau of approximately 9.2 billions to be reached within the next 60 years, representing roughly a 30 % increase in a...

UKCCSRC Call 2 project poster: Novel Materials and Reforming Process Route for the Production of Ready-Separated CO2/N2/H2, CSLF Call project poster reception, London, 27.06.16

This poster on the UKCCSRC Call 2 project Novel Materials and Reforming Process Route for the Production of Ready-Separated CO2/N2/H2 from Natural Gas Feedstocks was presented at the CSLF Call...

Habitat point records from 1973-81 DWT Devon and Cornwall occasional surveys

These are three separate studies of areas in Plymouth Sound. Each is treated as a separate site with a single habitat.

Species point records from 1973-81 DWT Devon and Cornwall occasional surveys

These are three separate studies of areas in Plymouth Sound. Each is treated as a separate site with a single habitat.

Innovation Fund

The Innovation Fund is a Government sponsored scheme designed to finance effective and innovative interventions to promote collaborative parenting among separated and separating families. The data...

Waste Composition Analysis - Flats

Analysis of tonnages of household waste presented in recycling, food waste, garden waste and residual waste bins. Based on sample survey bin contents from a number of flats. Includes a comparison...

The amino acid composition of 20 aragonite samples precipitated in vitro in the presence and absence of amino acid (aspartic acid and glycine, separately and in combination), the dipeptide glycyl-L-aspartic acid and tetra-aspartic acid.

Amino acid compositions of aragonite samples precipitated from seawater, using a pH stat titrator using the constant composition technique between September 2021 and December 2022. Samples were...

Waste Composition Analysis - Houses

Analysis of tonnages of household waste presented in recycling, food waste, garden waste and residual waste bins. Based on sample survey bin contents from a number of houses carried out in November...

Children and Family Court Advisory and Support Service Commissioning

Separated Parent Information Programme records of attendance, costs frequency of sessions for two years