Skip to main content

Help us improve the National Data Library - complete this short survey

Close survey banner

2024, Natural Power Consultants Ltd, Thanet Offshore Wind Farm, Benthic Survey

Publisher
Marine Environmental Data & Information Network
Updated
6 October 2024
Topic
Not set

Summary

Within the Environmental Statement (ES) for the development of the Thanet OWF, Thanet Offshore Wind Limited committed to undertaking three post-construction monitoring surveys over a ten-year period to help ascertain impacts of the wind farm during the construction and operational phases, or longer-term changes from those recorded pre-construction. In addition, post-construction surveys would help to provide further information where uncertainty remained and test predictions made in the ES. A FEPA Licence was granted for the construction and operation of the project in 2006 and was subsequently converted to a Marine Licence in 2013 (L/2013/00011/14), for which the accompanying Annex 1 described the requirements for post-construction benthic surveys as required under Marine Licence conditions 3.1.8 and 3.1.9. In line with Licence requirements, a Post-Construction Environmental Monitoring Plan (PCEMP) was produced (Thanet Offshore Wind Farm Limited, 2010) and agreed with the MMO which set out the survey programme and objectives for all post construction monitoring. The survey programme confirmed that changes would be monitored over a ten-year period, with surveys being undertaken in years one, five and ten following the completion of construction (2012, 2017 and 2022 respectively). The second post-construction monitoring survey (originally due in 2017) was completed in 2019, and the Licencing Authority has indicated that in order for Thanet Offshore Wind Limited to remain compliant with consent conditions, the third post-construction monitoring survey was then completed in in 2022. The objective of this third post construction survey is the assessment of any long-term changes in the benthic ecology resulting from the construction and subsequent operation of the OWF. This report details the findings of the third and final post-construction monitoring survey, completed in September 2022 and a comparison of results across pre-construction monitoring and all post-construction monitoring years.

Data links

Link Format Preview Updated
Marine Data Exchange 6/10/2024

Is this data/dataset useful? Give us feedback

Additional information

Source Metadata
XML, HTML
Date added
02 October 2024
Harvest GUID
2fc4d6e8de2cf06687d7f81463b97375
Extent (Latitude)
51.4607° to 51.4026°
Extent (Longitude)
1.5695° to 1.6878°
Spatial reference system
urn:ogc:def:crs:EPSG::4326
Dataset reference date (publication)
2024-06-24
Dataset reference date (revision)
2024-06-24
Frequency of update
notPlanned
Access constraints
Publicly Available
Responsible party
Natural Power Consultants (originator); The Crown Estate (custodian)
ISO 19139 resource type
series
Metadata language
eng

Contact

sayhello@naturalpower.com

Licence information

https://www.marinedataexchange.co.uk/content/info/terms-of-use