Data collected during two surveys of Lincs Belt rMCZ site. The first was
collected the following data: MB Bathymetry Coverage (Contractor): Partial
coverage (ITT_lncb_22_2012). CHP data planned for early 2015, and MB
Backscatter Coverage (Contractor): Partial coverage (ITT_lncb_22_2012). CHP
data planned for early 2015.
The second survey was carried out from Feb - Mar 2012, and collected the
following data: 8 Video and Stills samples - Unusable, 45 PSA samples, and 45
Infauna samples - 15 samples using WFD method only.