Skip to main content

Help us improve the National Data Library - complete this short survey

Close survey banner

M62 junction 25 to 30 traffic flow

Publisher
North Tyneside Metropolitan Borough Council
Updated
15 August 2026
Topic
Not set
Licence
Not set

Summary

A dataset providing a minute by minute traffic flow for Junctions 25 to 30 of the M62. Traffic data is recorded via inductive loops by the MIDAS Subsystem (Motorway Incident Detection and Automatic Signalling) for those sites that have been enabled as traffic counting sites. The geographic address includes both a figure for the distance along the carriageway (e.g. 1962 = 96.2km from the start of the motorway) and a letter suffix for the direction of travel. In this instance A = main carriageway West to East J = off slip roads West to East K = on slip roads West to East B = main carriageway East to West L = off slip roads East to West M = on slip roads East to West Traffic Counting data consists of the following for each minute for each site: Flow (vehicle count) by length category Flow (vehicle count) by lane Average speed (kph) by lane Average headway (deciseconds) by lane Occupancy (%) by lane Vehicles are categorised according to the following lengths: Category 1 no more than 5.2m Category 2 greater than 5.2m and no more than 6.6m Category 3 greater than 6.6m and no more than 11.6m Category 4 greater than 11.6m

Data links

Link Format Preview Updated
04/10/2016 15/8/2026
03/10/2016 15/8/2026
06/10/2016 15/8/2026
05/10/2016 15/8/2026
07/10/2016 15/8/2026
08/10/2016 15/8/2026
03/10/2016 B 15/8/2026
09/10/2016 15/8/2026
04/10/2016 B 15/8/2026
06/10/2016 B 15/8/2026
05/10/2016 B 15/8/2026
07/10/2016 B 15/8/2026
09/10/2016 B 15/8/2026
08/10/2016 B 15/8/2026
04/10/2016 15/8/2026
06/10/2016 15/8/2026
05/10/2016 15/8/2026
07/10/2016 15/8/2026
08/10/2016 15/8/2026
10/10/2016 15/8/2026
09/10/2016 15/8/2026
11/10/2016 15/8/2026
13/10/2016 15/8/2026
12/10/2016 15/8/2026
14/10/2016 15/8/2026
15/10/2016 15/8/2026
16/10/2016 15/8/2026
17/10/2016 15/8/2026
18/10/2016 15/8/2026
19/10/2016 15/8/2026

Is this data/dataset useful? Give us feedback

Additional information

Source Metadata
XML, HTML
Harvest GUID
e1d6d