Skip to main content

Help us improve the National Data Library - complete this short survey

Close survey banner

WFD RBMP2 Economic analysis 2015_Scenario 5_v1.7

Publisher
Environment Agency
Updated
6 July 2026
Topic
Not set

Summary

The impact assessment (IA) for the updated river basin management plans was built from multiple data sources and is based on many assumptions. The Scenario 5 dataset is based on programmes of measures with known and/or reasonably secure sources of funding. The 6 year phase (2015 to 2021) of the proposed option is created from scenario 5. It contains data for all water bodies in England. Attribution statement: © Environment Agency copyright and/or database right 2016. All rights reserved.

Data links

Link Format Preview Updated
WFD RBMP2 Economic analysis 2015_Scenario 5_v1.7 Download ZIP 6/7/2026

Is this data/dataset useful? Give us feedback

Additional information

Source Metadata
XML, HTML
Date added
25 July 2025
Harvest GUID
4a5eedd4-3742-4c51-b776-111b5947e699
Extent (Latitude)
55.816° to 49.943°
Extent (Longitude)
-6.236° to 2.072°
Spatial reference system
http://www.opengis.net/def/crs/EPSG/0/27700
Dataset reference date (creation)
2016-08-17
Dataset reference date (revision)
2025-07-25
Frequency of update
notPlanned
Access constraints
There are no public access constraints to this data. Use of this data is subject to the licence identified.
Responsible party
Environment Agency (pointOfContact)
ISO 19139 resource type
dataset
Metadata language
eng